How to Consider Supply Uncertainty of Renewable Resources in the Basic Data Structures of ERP-Systems

Production planning in companies often assumes that resource flows are constant. This idealized assumption does not reflect the problem of uncertain procurements. Especially renewable resources are underlying natural influences which result in uncertainties of the quality and quantity of the resource as well as an uncertain time of harvest and delivery. In this paper we analyze how procurement uncertainties of renewable resources can be taken into account in the basic data structures of ERP-systems, namely bill of materials (BOM), work schedules and time schedules. Therefore we describe certain variations methods as general possibilities to handle uncertainty. As a result it can be stated that not every type of BOM can consider uncertainties well enough. The work and time schedules cannot represent every kind of variation which is needed. Overall, a combination of both structures is a good possibility to gain a more flexible and thus a more certain planning.

[1]  J. Krupinsky,et al.  Managing Plant Disease Risk in Diversified Cropping Systems , 2002 .

[2]  Stefan Friedemann,et al.  Diffusion of IS in companies using renewable resources and its impact on uncertainty , 2011, AMCIS.

[3]  Werner Geiger Computergestützte Produktionsplanung und -steuerung im Mittelstand , 1991 .

[4]  Sameh M. Saad,et al.  Modelling uncertainty under a multi‐echelon ERP‐controlled manufacturing system , 2004 .

[5]  S. C. Lenny Koh,et al.  Change and uncertainty in SME manufacturing environments using ERP , 2005 .

[6]  Mark A. Burgman,et al.  Coping with uncertainty in forest wildlife planning , 1995 .

[7]  Anders Thorstenson,et al.  A procedure-oriented generic bill of materials , 1997 .

[8]  Peter W. Stonebraker,et al.  Restructuring the bill of material for productivity: A strategic evaluation of product configuration , 1996 .

[9]  Wgmm Werner Rutten,et al.  Hierarchical mathematical programming for operational planning in a process industry , 1993 .

[10]  Hans-Peter Wiendahl Betriebsorganisation für Ingenieure , 2009 .

[11]  K. Alicke,et al.  Planung und Betrieb von Logistiknetzwerken , 2003 .

[12]  Brian Dennis,et al.  Problems of Modeling Growth and Yield of Renewable Resources , 1985 .

[13]  Jc Jan Fransoo,et al.  A Typology of Production Control Situations in Process Industries , 1994 .

[14]  Stefan Friedemann,et al.  Potentials and Limitations of RFID to Reduce Uncertainty in Production Planning with Renewable Resources , 2011, LISS.

[15]  Dietrich Adam Planung und Entscheidung , 1992 .

[16]  L. Whitman,et al.  Methodology to mitigate supplier risk in an aerospace supply chain , 2004 .

[17]  N. Zhang,et al.  Precision agriculture—a worldwide overview , 2002 .

[18]  Michael Narodoslawsky,et al.  Renewable Resources - New Challenges for Process Integration and Synthesis , 2003 .

[19]  Chrwan-Jyh Ho,et al.  Evaluating the impact of operating environments on MRP system nervousness , 1989 .