How to Consider Supply Uncertainty of Renewable Resources in the Basic Data Structures of ERP-Systems
暂无分享,去创建一个
[1] J. Krupinsky,et al. Managing Plant Disease Risk in Diversified Cropping Systems , 2002 .
[2] Stefan Friedemann,et al. Diffusion of IS in companies using renewable resources and its impact on uncertainty , 2011, AMCIS.
[3] Werner Geiger. Computergestützte Produktionsplanung und -steuerung im Mittelstand , 1991 .
[4] Sameh M. Saad,et al. Modelling uncertainty under a multi‐echelon ERP‐controlled manufacturing system , 2004 .
[5] S. C. Lenny Koh,et al. Change and uncertainty in SME manufacturing environments using ERP , 2005 .
[6] Mark A. Burgman,et al. Coping with uncertainty in forest wildlife planning , 1995 .
[7] Anders Thorstenson,et al. A procedure-oriented generic bill of materials , 1997 .
[8] Peter W. Stonebraker,et al. Restructuring the bill of material for productivity: A strategic evaluation of product configuration , 1996 .
[9] Wgmm Werner Rutten,et al. Hierarchical mathematical programming for operational planning in a process industry , 1993 .
[10] Hans-Peter Wiendahl. Betriebsorganisation für Ingenieure , 2009 .
[11] K. Alicke,et al. Planung und Betrieb von Logistiknetzwerken , 2003 .
[12] Brian Dennis,et al. Problems of Modeling Growth and Yield of Renewable Resources , 1985 .
[13] Jc Jan Fransoo,et al. A Typology of Production Control Situations in Process Industries , 1994 .
[14] Stefan Friedemann,et al. Potentials and Limitations of RFID to Reduce Uncertainty in Production Planning with Renewable Resources , 2011, LISS.
[15] Dietrich Adam. Planung und Entscheidung , 1992 .
[16] L. Whitman,et al. Methodology to mitigate supplier risk in an aerospace supply chain , 2004 .
[17] N. Zhang,et al. Precision agriculture—a worldwide overview , 2002 .
[18] Michael Narodoslawsky,et al. Renewable Resources - New Challenges for Process Integration and Synthesis , 2003 .
[19] Chrwan-Jyh Ho,et al. Evaluating the impact of operating environments on MRP system nervousness , 1989 .