European and French regulations state that 50% of the energy mix in the French Caribbean should be sourced from renewable energies by 2020. Because of the volcanic conditions of the French Caribbean islands, geothermal energy would seem to be a very favorable solution to reach this ambitious objective, as, unlike other renewable sources, it is continuous and weather independent. According to the Intergovernmental Panel on Climate Change (IPCC), geothermal energy source is recognized as a competitive energy source (with a carbon footprint around 50 gCO 2eq /kWh over its lifetime) compared to conventional energies such as coal or oil (with a carbon footprint around 800 g CO 2 eq /kWh). The IPCC make their overall environmental assessments of energy pathways using Life Cycle Assessment (LCA). LCA assesses the environmental and human health impacts throughout the life cycle stages of a product by providing a " cradle-to-grave " environmental profile. A LCA of an existing high temperature geothermal system is reported here with two objectives: quantifying the environmental impacts of a geothermal plant installed in the French Caribbean islands, and comparing and identifying technological alternatives which potentially reduce its environmental impacts. The geothermal power plant assessed in this study is Bouillante geothermal power plant located in the Guadeloupe island. Built in the 80s, Bouillante is a high temperature geothermal system (the reservoir temperature is around 250°C) which is representative, in terms of size, spatial and technological constraints, of future power plants to be developed in French overseas territories. Its medium size (15.75 MW) enables it to supply 6 to 7% of Guadeloupe's annual electricity needs. It has two production units: UB1, a double flash technology (4.75 MW), and UB2, a simple flash technology (11 MW). The data inventory is mainly based on site-specific data, extracted from drilling reports: annual environmental and exploitation reports, and technical sheets completed with personal communication with experts. This power plant however presents some unusual design configurations related to the age of its construction: use of a sea water cooling system and absence of geothermal fluid reinjection. To model a configuration that fits better with current practices, two new scenarios based on alternative technologies are considered: a cooling tower or air dry cooling condensers. Three scenarios are assessed via a multicriteria approach using a selection of life cycle environmental indicators: climate change, water consumption, eutrophication, land use, ecotoxicity, primary energy demand, abiotic depletion, acidification and human toxicity. These environmental indicators are assessed at all phases of the plant life cycle: drilling, construction and installation of the surface equipment, operation, and end of life (decommissioning). First results show that greenhouse gases (GHG) are mostly generated at the operation step (around 90% of total GHG) and are mainly due to leakage of CO 2 and CH 4 emissions (a geothermal stream is composed of non-condensable gases fraction such as CO 2 , and CH 4 which are emitted due to the decrease in pressure). Results range from 38 to 47 gCO 2eq /kWh over the 3 scenarios. Primary energy demand is mainly due to the construction and installation phase (around 70% of total energy consumption) from background processes such as steel or copper production processes. The primary energy demand and GHG for the reference scenario and the cooling tower system alternatives are found to be lower than those for the aerocondenser cooling system scenario (for the same energy production). As an outcome of the study, we establish the development of a general parameterized LCA model developed for conventional geothermal systems with a temperature reservoir ranging from 230°C to 300°C. Results obtained from this model enable high temperature geothermal systems to be positioned from an environmental perspective in comparison with other energy systems, and also highlight the main drivers leading to the reduction of environmental impacts of future geothermal systems.
[1]
Martin Pehnt,et al.
Dynamic life cycle assessment (LCA) of renewable energy technologies
,
2006
.
[2]
Philipp Blum,et al.
Review on life cycle environmental effects of geothermal power generation
,
2013
.
[3]
Hiroki Hondo,et al.
Life cycle GHG emission analysis of power generation systems: Japanese case
,
2005
.
[4]
Didier Beloin-Saint-Pierre,et al.
Espace-PV: Key Sensitive Parameters for Environmental Impacts of Grid-Connected PV Systems With LCA
,
2008
.
[5]
Isabelle Blanc,et al.
Environmental analysis of practical design options for enhanced geothermal systems (EGS) through life-cycle assessment
,
2013
.
[6]
Ali Benhaddouche,et al.
L'industrie en Guadeloupe : un secteur face à ses défis
,
2010
.
[7]
Dominika Matuszewska.
Environomic optimal design of geothermal conversion systems using life cycle assessment
,
2011
.
[8]
Carol A Boyle,et al.
Comparison of life cycle carbon dioxide emissions and embodied energy in four renewable electricity generation technologies in New Zealand.
,
2009,
Environmental science & technology.
[9]
Roland Clift,et al.
The application of Life Cycle Assessment to Integrated Solid Waste Management - Part 1 - Methodology
,
2000
.
[10]
Stephan Schmid,et al.
energy [r]evolution - A sustainable world energy outlook
,
2007
.
[11]
R. Newman.
Promotion of the use of energy from renewable sources
,
2014
.
[12]
Subir K. Sanyal,et al.
Success of geothermal wells : a global study
,
2013
.
[13]
Hans-Jürgen Dr. Klüppel,et al.
The Revision of ISO Standards 14040-3 - ISO 14040: Environmental management Life cycle assessment Principles and framework - ISO 14044: Environmental management Life cycle assessment Requirements and guidelines
,
2005
.
[14]
Vasilis Fthenakis,et al.
Life-cycle uses of water in U.S. electricity generation
,
2010
.
[15]
Lennart Olsson,et al.
Categorising tools for sustainability assessment
,
2007
.
[16]
François Maréchal,et al.
Design of geothermal energy conversion systems with a life cycle assessment perspective
,
2012
.
[17]
Göran Finnveden,et al.
The Application of Life Cycle Assessment to Integrated Solid Waste Management: Part 2—Perspectives on Energy and Material Recovery from Paper
,
2000
.
[18]
Martin Kaltschmitt,et al.
Life cycle assessment of geothermal binary power plants using enhanced low-temperature reservoirs
,
2010
.