Improving Hot Mix Asphalt Production Using Computer Simulation and Real Time Optimization

The quality of hot mix asphalt is affected by the quality and consistency of input aggregates and the control of the production process. To improve the quality of hot mix asphalt, both the aggregates gradation and the process variables must be considered. Current practice involves taking samples from actual production and analyzing them in the lab. The entire process can take two hours, which, along with being expensive, is not amenable to real time online process control or even in knowing how much product is actually out of specification. In this paper, an online control system is proposed that can be used to significantly decrease the analysis time and adjust production by using discrete time stochastic simulation combined with algorithmic optimization. Additionally, the system can readily show when a mix is out of specification without lag time or physical experimentation. Results show that this approach can effectively control the production process resulting in improved quality. This is the first known such application in hot mix asphalt online process control.

[1]  Carl L Monismith,et al.  Quality Control–Quality Assurance Sampling Strategies for Hot-Mix Asphalt Construction , 2009 .

[2]  J S Coplantz,et al.  Evaluation of Quality Control/Quality Assurance Implementation for Asphalt Concrete Specifications in California , 1999 .

[3]  Rod E. Turochy,et al.  Comparisons of Contractor and State Transportation Agency Quality Assurance Test Results on Mat Density of Hot-Mix Asphalt Concrete , 2007 .

[4]  Randy C West Development of Rapid QC Procedures for Evaluation of HMA Properties During Production , 2005 .

[5]  Joe P. Mahoney,et al.  Online Tools for Hot-Mix Asphalt Monitoring , 2002 .

[6]  Rod E. Turochy,et al.  Quality Assurance of Hot-Mix Asphalt: Comparison of Contractor Quality Control and Georgia Department of Transportation Data , 2006 .

[7]  Da-jin Guo,et al.  Application of Uncertainty Analytic Hierarchy Process Method for Asphalt Pavement Construction Quality Control in China , 2009 .

[8]  Kevin D Hall,et al.  Establishing Variability for Hot-Mix Asphalt Construction in Arkansas , 2002 .

[9]  Xiaoxiong Zhong,et al.  Study of Compaction in Hot-Mix Asphalt Using Computer Simulations , 2008 .

[10]  Marcelo Moretti Fioroni,et al.  Simulation of continuous behavior using discrete tools: Ore conveyor transport , 2007, 2007 Winter Simulation Conference.

[11]  Jeffrey S. Smith,et al.  A simulation methodology for online process control of hot mix asphalt (HMA) production , 2010, Proceedings of the 2010 Winter Simulation Conference.