Random lead times in replenishment planning for single-level assembly systems: The value of information

Abstract Lead times and their variability have a key role to play in multi-component assembly systems, directly impacting their performance. They are rarely known exactly in advance, being generated by various sources of uncertainty. This paper focuses on the stochastic solution of the replenishment planning problem of a single-level assembly system, in the framework of which: (i) procurement decisions must be made before the fixed demands are realized, and (ii) backlogs are authorized. By approaching this problem in the context of stochastic programming, we discuss the value of (stochastic) information for, subsequently, characterizing and better apprehending the grade of stochasticity and its effect on the corresponding solutions.

[1]  Hsien-Jen Lin Investing in lead-time variability reduction in a collaborative vendor-buyer supply chain model with stochastic lead time , 2016, Comput. Oper. Res..

[2]  Ilias P. Tatsiopoulos,et al.  Lead time management , 1983 .

[3]  Enver Yücesan,et al.  Lead times, order release mechanisms, and customer service , 2000, Eur. J. Oper. Res..

[4]  Desheng Dash Wu,et al.  Single-period inventory model for one-level assembly system with stochastic lead times and demand , 2016 .

[5]  R. John Milne,et al.  Optimizing planned lead times for enhancing performance of MRP systems , 2015 .

[6]  Jose M. Framinan,et al.  Inventory record inaccuracy – The impact of structural complexity and lead time variability , 2017 .

[7]  Alexandre Dolgui,et al.  Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm , 2009, Eur. J. Oper. Res..

[8]  Alexandre Dolgui,et al.  Optimal supply planning in MRP environments for assembly systems with random component procurement times , 2008 .

[9]  Mordecai Avriel,et al.  The Value of Information and Stochastic Programming , 1970, Oper. Res..

[10]  Samuel Kotz,et al.  R Programs for Truncated Distributions , 2006 .

[11]  Alexandre Dolgui,et al.  Supply planning under uncertainties in MRP environments: A state of the art , 2007, Annu. Rev. Control..

[12]  Zhi-Hai Zhang,et al.  Robust design of (s, S) inventory policy parameters in supply chains with demand and lead time uncertainties , 2015, Int. J. Syst. Sci..

[13]  George B. Dantzig,et al.  Linear Programming Under Uncertainty , 2004, Manag. Sci..

[14]  Alexandre Dolgui,et al.  A State of the Art on Supply Planning and Inventory Control under Lead Time Uncertainty , 2013 .

[15]  Alexandre Dolgui,et al.  Supply planning for single-level assembly system with stochastic component delivery times and service level constraint , 2008 .

[16]  E. Beale ON MINIMIZING A CONVEX FUNCTION SUBJECT TO LINEAR INEQUALITIES , 1955 .

[17]  Ton G. de Kok,et al.  Setting Planned Leadtimes in Customer-Order-Driven Assembly Systems , 2016, Manuf. Serv. Oper. Manag..

[18]  John R. Birge,et al.  The value of the stochastic solution in stochastic linear programs with fixed recourse , 1982, Math. Program..

[19]  A. Madansky Inequalities for Stochastic Linear Programming Problems , 1960 .

[20]  de Ag Ton Kok,et al.  The effect of updating lead times on the performance of hierarchical planning systems , 2006 .

[21]  Xun Wang,et al.  Inventory management for stochastic lead times with order crossovers , 2016, Eur. J. Oper. Res..

[22]  Tao Yao,et al.  Robust inventory control under demand and lead time uncertainty , 2017, Ann. Oper. Res..