Planning tool requirements for flexible manufacturing: an analytical approach
暂无分享,去创建一个
[1] Christopher S. Tang,et al. Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches , 1988, Oper. Res..
[2] Subhash C. Sarin,et al. The machine loading and tool allocation problem in a flexible manufacturing system , 1987 .
[3] Alan Cobham,et al. Priority Assignment in Waiting Line Problems , 1954, Oper. Res..
[4] J. A. Ventura,et al. Loading tools to machines in flexible manufacturing systems , 1988 .
[5] A. S. Carrie,et al. Work scheduling in FMS under tool availability constraints , 1986 .
[6] Joseph Sharit,et al. Computerization of tool-replacement decision making in flexible manufacturing systems: a human-systems perspective , 1989 .
[7] Diwakar Gupta,et al. A framework for understanding flexibility of manufacturing systems , 1989 .
[8] Peter O'Grady,et al. Loading a flexible manufacturing system , 1987 .
[9] P. Tomek. Tooling concepts for FMS , 1986 .
[10] Giancarlo Maccarini,et al. F.M.S. tool supply in a stochastic environment: Strategies and related reliabilities , 1990 .
[11] G. John Miltenburg,et al. Evaluating Flexible Manufacturing Systems , 1987 .
[12] Min-Hong Han,et al. Real-time tool control and job dispatching in flexible manufacturing systems , 1989 .
[13] B. L. Foote,et al. The effect of batch sizing and customer pressure (order modification) on a hybrid assembly job shop , 1989 .
[14] Kathryn E. Stecke,et al. Loading and control policies for a flexible manufacturing system , 1981 .