Evaluation of Interruption Costs for Industrial Customers in Korea
暂无分享,去创建一个
[1] B. N. Suddeth,et al. Interruption costs, customer satisfaction and expectations for service reliability , 1996 .
[2] Arun P. Sanghvi. MEASUREMENT AND APPLICATION OF CUSTOMER INTERRUPTION EVALUATION SOME COMMONLY RAISED ISSUES COSTS/VALUE OF SERVICE FOR COST-BENEFIT RELIABILITY , 1990 .
[3] Roy Billinton,et al. Reliability Evaluation of Engineering Systems , 1983 .
[4] Roy Billinton,et al. Reliability evaluation of engineering systems : concepts and techniques , 1992 .
[5] A. P. Sanghvi. Measurement and application of customer interruption costs/value of service for cost-benefit reliability evaluation: some commonly raised issues , 1990 .
[6] Ronald N. Allan,et al. Bibliography on the Application of Probability Methods in Power System Reliability Evaluation 1996-1999 , 1984 .
[7] Susumu Yamashiro,et al. A Survey Study on Estimation of Customer Interruption Costs , 1999 .
[8] Roy Billinton,et al. Power-system reliability in perspective , 1984 .
[9] R. Billinton,et al. Comparison of Two Alternate Methods to Establish an Interrupted Energy Assessment Rate , 1987, IEEE Transactions on Power Systems.