A performance evaluation of disassembly systems with reverse blocking
暂无分享,去创建一个
Masayuki Matsui | Tetsuo Yamada | Tetsuo Yamada | Naoyuki Mizuhara | Hisashi Yamamoto | M. Matsui | Hisashi Yamamoto | Naoyuki Mizuhara
[1] Surendra M. Gupta,et al. Buffer allocation plan for a remanufacturing cell , 2005, Comput. Ind. Eng..
[2] Nutthapol Asadathorn,et al. A decomposition approximation for assembly‐disassembly queueing networkswith finite buffer and blocking , 1999, Ann. Oper. Res..
[3] Askiner Gungor,et al. Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .
[4] Christos Zikopoulos,et al. Optimal location and value of timely sorting of used items in a remanufacturing supply chain with multiple collection sites , 2008 .
[5] Paola Inverardi,et al. A review on queueing network models with finite capacity queues for software architectures performance prediction , 2003, Perform. Evaluation.
[6] D. Guide,et al. Business Aspects of Closed-Loop Supply Chains , 2003 .
[7] Alfred J.D. Lambert,et al. Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling , 2004 .
[8] Mostafa H. Ammar,et al. Equivalence Relations in Queueing Models of Fork/Join Networks with Blocking , 1989, Perform. Evaluation.
[9] Lucienne Blessing,et al. Sustainability in manufacturing: Recovery of resources in product and material cycles , 2007 .