The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling model

Over the past few years growing global competition has forced the manufacturing industries to upgrade their old production strategies with the modern day approaches. As a result, recent interest has been developed towards finding an appropriate policy that could enable them to compete with others, and facilitate them to emerge as a market winner. Keeping in mind the abovementioned facts, in this paper the authors have proposed an integrated process planning and scheduling model inheriting the salient features of outsourcing, and leagile principles to compete in the existing market scenario. The paper also proposes a model based on leagile principles, where the integrated planning management has been practiced. In the present work a scheduling problem has been considered and overall minimization of makespan has been aimed. The paper shows the relevance of both the strategies in performance enhancement of the industries, in terms of their reduced makespan. The authors have also proposed a new hybrid Enhanced Swift Converging Simulated Annealing (ESCSA) algorithm, to solve the complex real-time scheduling problems. The proposed algorithm inherits the prominent features of the Genetic Algorithm (GA), Simulated Annealing (SA), and the Fuzzy Logic Controller (FLC). The ESCSA algorithm reduces the makespan significantly in less computational time and number of iterations. The efficacy of the proposed algorithm has been shown by comparing the results with GA, SA, Tabu, and hybrid Tabu-SA optimization methods.

[1]  G. Zäpfel Customer-order-driven production: An economical concept for responding to demand uncertainty? , 1998 .

[2]  Remko I. van Hoek,et al.  RECONFIGURING THE SUPPLY CHAIN TO IMPLEMENT POSTPONED MANUFACTURING , 1998 .

[3]  J Prince,et al.  Combining lean and agile characteristics: Creation of virtual groups by enhanced production flow analysis , 2003 .

[4]  Denis Royston Towill,et al.  Lean, agile or leagile? Matching your supply chain to the marketplace , 2000 .

[5]  Gerd Finke,et al.  Selection of process plans in automated manufacturing systems , 1988, IEEE J. Robotics Autom..

[6]  D. Towill,et al.  Supply chain migration from lean and functional to agile and customised , 2000 .

[7]  Chelliah Sriskandarajah,et al.  A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..

[8]  R. Strattona,et al.  The strategic integration of agile and lean supply , 2022 .

[9]  Andrea Zangiacomi,et al.  Process planning and scheduling for mass customised shoe manufacturing , 2004, Int. J. Comput. Integr. Manuf..

[10]  Chris N. Potts,et al.  A Branch and Bound Algorithm for the Total Weighted Tardiness Problem , 1985, Oper. Res..

[11]  R. V. Hoek,et al.  Postponed manufacturing: a case study in the food supply chain , 1997 .

[12]  Anita Lee,et al.  Flexible manufacturing system (FMS) scheduling using filtered beam search , 1990, J. Intell. Manuf..

[13]  George L. Nemhauser,et al.  The fleet assignment problem: Solving a large-scale integer program , 1995, Math. Program..

[14]  BrowneJ.,et al.  Future manufacturing systemstowards the extended enterprise , 1995 .

[15]  Peter McCullen,et al.  Achieving lean supply through agile manufacturing , 2001 .

[16]  大野 耐一,et al.  Toyota production system : beyond large-scale production , 1988 .

[17]  Sally C. Brailsford,et al.  The progressive party problem: Integer linear programming and constraint programming compared , 1995, Constraints.

[18]  R. Kolisch,et al.  Efficient methods for scheduling make-to-order assemblies under resource, assembly area and part availability constraints , 2000 .

[19]  M. Eugene Merchant,et al.  IPPM – A Prototype to Integrate Process Planning and Job Shop Scheduling Functions , 1993 .

[20]  Martin Desrochers,et al.  A New Optimization Algorithm for the Vehicle Routing Problem with Time Windows , 1990, Oper. Res..

[21]  Felix T.S. Chan,et al.  Modelling of integrated, distributed and cooperative process planning system using an agent-based approach , 2001 .

[22]  Kumar Bhaskaran Process plan selection , 1990 .

[23]  Arabinda Tripathy Shop Floor Control Systems: From Design to Implementation , 1993 .

[24]  Jc Johan Wortmann,et al.  Future manufacturing systems—towards the extended enterprise , 1995 .

[25]  Chiung Moon,et al.  Advanced planning and scheduling with outsourcing in manufacturing supply chain , 2002 .

[26]  Danny Berry,et al.  Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain , 1999 .

[27]  Joakim Wikner,et al.  Mass customization in terms of the customer order decoupling point , 2004 .

[28]  Alan Harrison,et al.  From lean to agile manufacturing , 1997 .

[29]  Joakim Wikner,et al.  Integrating production and engineering perspectives on the customer order decoupling point , 2005 .

[30]  Ellis Horowitz,et al.  Fundamentals of Data Structures in Pascal , 1984 .

[31]  Hossein Sharifi,et al.  A methodology for achieving agility in manufacturing organisations : An introduction , 1999 .

[32]  M. Naim,et al.  Developing Lean and Agile Supply Chains in the Uk Housebuilding Industry , 1999 .

[33]  M. Tiwari,et al.  A fuzzy goal-programming model of machine-tool selection and operation allocation problem in FMS: a quick converging simulated annealing-based approach , 2006 .

[34]  J. Browne,et al.  The extended enterprise-a context for manufacturing , 1998 .

[35]  Mark M. Davis,et al.  Systems Design Framework for the Extended Enterprise , 1999 .

[36]  Andrew Y. C. Nee,et al.  Using genetic algorithms in process planning for job shop machining , 1997, IEEE Trans. Evol. Comput..

[37]  Xian Zhou,et al.  STOCHASTIC SCHEDULING WITH PREEMPTIVE-REPEAT MACHINE BREAKDOWNS TO MINIMIZE THE EXPECTED WEIGHTED FLOW TIME , 2003, Probability in the Engineering and Informational Sciences.

[38]  Mitsuo Gen,et al.  Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling , 2003, Appl. Soft Comput..

[39]  John C. Wortmann,et al.  Factory of the Furture: Towards an Integrated Theory for One-of-a-Kind Production , 1991, One-Of-A-Kind Production.

[40]  Rahul Rai,et al.  Machine-tool selection and operation allocation in FMS: Solving a fuzzy goal-programming model using a genetic algorithm , 2002 .

[41]  Hong-Chao Zhang,et al.  An integrated model of process planning and production scheduling , 1994 .

[42]  Gareth J. Palmer,et al.  A simulated annealing approach to integrated production scheduling , 1996, J. Intell. Manuf..

[43]  Sally C. Brailsford,et al.  The Progressive Party Problem: Integer Linear Programming and Constraint Programming Compared , 1995, CP.

[44]  Manoj Kumar Tiwari,et al.  An integrated approach to solving the process plan selection problem in an automated manufacturing system , 1998 .

[45]  Shimon Y. Nof,et al.  Scheduling/rescheduling in the manufacturing operating system environment† , 1985 .

[46]  Jie Zhang,et al.  Modelling for agile manufacturing systems , 2001 .

[47]  Behrokh Khoshnevis,et al.  Integration of process planning and scheduling functions , 1991, J. Intell. Manuf..

[48]  Taiichi Ohno,et al.  Toyota Production System : Beyond Large-Scale Production , 1988 .

[49]  Manoj Kumar Tiwari,et al.  Scheduling of flexible manufacturing systems: An ant colony optimization approach , 2003 .

[50]  Elsayed A. Elsayed,et al.  Job shop scheduling with alternative machines , 1990 .