The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling model
暂无分享,去创建一个
[1] G. Zäpfel. Customer-order-driven production: An economical concept for responding to demand uncertainty? , 1998 .
[2] Remko I. van Hoek,et al. RECONFIGURING THE SUPPLY CHAIN TO IMPLEMENT POSTPONED MANUFACTURING , 1998 .
[3] J Prince,et al. Combining lean and agile characteristics: Creation of virtual groups by enhanced production flow analysis , 2003 .
[4] Denis Royston Towill,et al. Lean, agile or leagile? Matching your supply chain to the marketplace , 2000 .
[5] Gerd Finke,et al. Selection of process plans in automated manufacturing systems , 1988, IEEE J. Robotics Autom..
[6] D. Towill,et al. Supply chain migration from lean and functional to agile and customised , 2000 .
[7] Chelliah Sriskandarajah,et al. A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..
[8] R. Strattona,et al. The strategic integration of agile and lean supply , 2022 .
[9] Andrea Zangiacomi,et al. Process planning and scheduling for mass customised shoe manufacturing , 2004, Int. J. Comput. Integr. Manuf..
[10] Chris N. Potts,et al. A Branch and Bound Algorithm for the Total Weighted Tardiness Problem , 1985, Oper. Res..
[11] R. V. Hoek,et al. Postponed manufacturing: a case study in the food supply chain , 1997 .
[12] Anita Lee,et al. Flexible manufacturing system (FMS) scheduling using filtered beam search , 1990, J. Intell. Manuf..
[13] George L. Nemhauser,et al. The fleet assignment problem: Solving a large-scale integer program , 1995, Math. Program..
[14] BrowneJ.,et al. Future manufacturing systemstowards the extended enterprise , 1995 .
[15] Peter McCullen,et al. Achieving lean supply through agile manufacturing , 2001 .
[16] 大野 耐一,et al. Toyota production system : beyond large-scale production , 1988 .
[17] Sally C. Brailsford,et al. The progressive party problem: Integer linear programming and constraint programming compared , 1995, Constraints.
[18] R. Kolisch,et al. Efficient methods for scheduling make-to-order assemblies under resource, assembly area and part availability constraints , 2000 .
[19] M. Eugene Merchant,et al. IPPM – A Prototype to Integrate Process Planning and Job Shop Scheduling Functions , 1993 .
[20] Martin Desrochers,et al. A New Optimization Algorithm for the Vehicle Routing Problem with Time Windows , 1990, Oper. Res..
[21] Felix T.S. Chan,et al. Modelling of integrated, distributed and cooperative process planning system using an agent-based approach , 2001 .
[22] Kumar Bhaskaran. Process plan selection , 1990 .
[23] Arabinda Tripathy. Shop Floor Control Systems: From Design to Implementation , 1993 .
[24] Jc Johan Wortmann,et al. Future manufacturing systems—towards the extended enterprise , 1995 .
[25] Chiung Moon,et al. Advanced planning and scheduling with outsourcing in manufacturing supply chain , 2002 .
[26] Danny Berry,et al. Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain , 1999 .
[27] Joakim Wikner,et al. Mass customization in terms of the customer order decoupling point , 2004 .
[28] Alan Harrison,et al. From lean to agile manufacturing , 1997 .
[29] Joakim Wikner,et al. Integrating production and engineering perspectives on the customer order decoupling point , 2005 .
[30] Ellis Horowitz,et al. Fundamentals of Data Structures in Pascal , 1984 .
[31] Hossein Sharifi,et al. A methodology for achieving agility in manufacturing organisations : An introduction , 1999 .
[32] M. Naim,et al. Developing Lean and Agile Supply Chains in the Uk Housebuilding Industry , 1999 .
[33] M. Tiwari,et al. A fuzzy goal-programming model of machine-tool selection and operation allocation problem in FMS: a quick converging simulated annealing-based approach , 2006 .
[34] J. Browne,et al. The extended enterprise-a context for manufacturing , 1998 .
[35] Mark M. Davis,et al. Systems Design Framework for the Extended Enterprise , 1999 .
[36] Andrew Y. C. Nee,et al. Using genetic algorithms in process planning for job shop machining , 1997, IEEE Trans. Evol. Comput..
[37] Xian Zhou,et al. STOCHASTIC SCHEDULING WITH PREEMPTIVE-REPEAT MACHINE BREAKDOWNS TO MINIMIZE THE EXPECTED WEIGHTED FLOW TIME , 2003, Probability in the Engineering and Informational Sciences.
[38] Mitsuo Gen,et al. Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling , 2003, Appl. Soft Comput..
[39] John C. Wortmann,et al. Factory of the Furture: Towards an Integrated Theory for One-of-a-Kind Production , 1991, One-Of-A-Kind Production.
[40] Rahul Rai,et al. Machine-tool selection and operation allocation in FMS: Solving a fuzzy goal-programming model using a genetic algorithm , 2002 .
[41] Hong-Chao Zhang,et al. An integrated model of process planning and production scheduling , 1994 .
[42] Gareth J. Palmer,et al. A simulated annealing approach to integrated production scheduling , 1996, J. Intell. Manuf..
[43] Sally C. Brailsford,et al. The Progressive Party Problem: Integer Linear Programming and Constraint Programming Compared , 1995, CP.
[44] Manoj Kumar Tiwari,et al. An integrated approach to solving the process plan selection problem in an automated manufacturing system , 1998 .
[45] Shimon Y. Nof,et al. Scheduling/rescheduling in the manufacturing operating system environment† , 1985 .
[46] Jie Zhang,et al. Modelling for agile manufacturing systems , 2001 .
[47] Behrokh Khoshnevis,et al. Integration of process planning and scheduling functions , 1991, J. Intell. Manuf..
[48] Taiichi Ohno,et al. Toyota Production System : Beyond Large-Scale Production , 1988 .
[49] Manoj Kumar Tiwari,et al. Scheduling of flexible manufacturing systems: An ant colony optimization approach , 2003 .
[50] Elsayed A. Elsayed,et al. Job shop scheduling with alternative machines , 1990 .