Enhancing construction project supply chains and performance evaluation methods: a case study of a bridge construction project
暂无分享,去创建一个
Nai-Hsin PanN.-H. Pan | Yung-Yu LinY.-Y. Lin | Nang-Fei PanN.-F. Pan | N. Pan | Nai-Hsin Pan | Yung-yu Lin
[1] H. Ping Tserng,et al. Developing a resource supply chain planning system for construction projects , 2006 .
[2] Iris D. Tommelein,et al. Strategic Positioning of Inventory to Match Demand in a Capital Projects Supply Chain , 2004 .
[3] Kevin McCormack,et al. Linking SCOR planning practices to supply chain performance: An exploratory study , 2004 .
[4] S. Chopra,et al. Supply Chain Management: Strategy, Planning & Operation , 2007 .
[5] Joseph H. M. Tah,et al. Towards an agent-based construction supply network modelling and simulation platform , 2005 .
[6] Sunil K. Sheoran,et al. A review and analysis of supply chain operations reference (SCOR) model , 2004 .
[7] Matt Syal,et al. Supply Chain Simulation Modeling for the Manufactured Housing Industry , 2006 .
[8] Lauri Koskela,et al. The four roles of supply chain management in construction , 2000 .