Information processing structures and decision making delays in MRP and JIT

Prior literature has asserted that higher supply chain visibility, concerned with better information flow and determining more accurate demand levels within the supply chain at a given time, improves decision-making efficiency. Decision-making efficiency denoted by decision-making delay is in turn dependent on the information processing structure. Different production control systems have different information processing structures. This paper considers the relations between the production control system (MRP and JIT) and the organization structure of information processing that determines the decision making delay. We compare MRP and JIT across different information processing structures and decision efficiency, and find that JIT is suitable for small lot size and large variety production and MRP for large lot size and small variety production. In addition, an optimized organization structure of information processing will surely reduce the decision making delay.

[1]  Jay R. Galbraith Designing Complex Organizations , 1973 .

[2]  Jie Yang,et al.  Improving learning alliance performance for manufacturers: Does knowledge sharing matter? , 2016 .

[3]  Ray Y. Zhong,et al.  A big data approach for logistics trajectory discovery from RFID-enabled production data , 2015 .

[4]  Abagail McWilliams,et al.  The Resource-Based View of the Firm , 1995 .

[5]  Anders Segerstedt Formulas of MRP , 1996 .

[6]  U. Juettner,et al.  Supply chain resilience in the global financial crisis: an empirical study , 2011 .

[7]  S. Koh,et al.  ERP II: The involvement, benefits and impediments of collaborative information sharing , 2008 .

[8]  Scott L. Newbert Empirical research on the resource‐based view of the firm: an assessment and suggestions for future research , 2007 .

[9]  B. Wernerfelt,et al.  A Resource-Based View of the Firm , 1984 .

[10]  Ing-Long Wu,et al.  Information sharing and collaborative behaviors in enabling supply chain performance: A social exchange perspective , 2014 .

[11]  Chad W. Autry,et al.  A contingent resource-based perspective of supply chain resilience and robustness , 2014 .

[12]  Jian Jhen Chen,et al.  Coordination of information sharing in a supply chain , 2013 .

[13]  Angappa Gunasekaran,et al.  Determinants of RFID adoption intention by SMEs: an empirical investigation , 2016 .

[14]  Yih-Long Chang,et al.  An integrated MRP and JIT framework , 2001 .

[15]  Irene Bertschek,et al.  Productivity Effects of Organizational Change: Microeconometric Evidence , 2001, Manag. Sci..

[16]  Indranil Bose,et al.  Managing a Big Data project: The case of Ramco Cements Limited , 2015 .

[17]  Jan Olhager,et al.  Supply chain integration and performance: The effects of long-term relationships, information technology and sharing, and logistics integration , 2012 .

[18]  Jay R. Galbraith Organization Design , 1977 .

[19]  Wouter Dessein,et al.  When Does Coordination Require Centralization? , 2006 .

[20]  Essam Shehab,et al.  Detailed cost estimating in the automotive industry: Data and information requirements , 2011 .

[21]  J. Stein,et al.  Information Production and Capital Allocation: Decentralized vs. Hierarchical Firms , 2000 .

[22]  Sdp Simme Douwe Flapper,et al.  Embedding JIT into MRP , 1991 .

[23]  R. Narasimhan,et al.  The antecedent role of quality, information sharing and supply chain proximity on strategic alliance formation and performance , 2005 .

[24]  Wallace J. Hopp,et al.  Factory physics : foundations of manufacturing management , 1996 .

[25]  Shahriar Akter,et al.  How to improve firm performance using big data analytics capability and business strategy alignment , 2016 .

[26]  Choong Y. Lee A Recent Development of the Integrated Manufacturing System: A Hybrid of MRP and JIT , 1993 .

[27]  J. Miltenburg,et al.  Computational complexity of algorithms for MRP and JIT production planning problems in enterprise resource planning systems , 2001 .

[28]  Juan Jose Nativi,et al.  Impact of RFID information-sharing strategies on a decentralized supply chain with reverse logistics operations , 2012 .

[29]  Mahesh Gupta,et al.  Comparing TOC with MRP and JIT: a literature review , 2009 .

[30]  Kim Hua Tan,et al.  Harvesting big data to enhance supply chain innovation capabilities: An analytic infrastructure based on deduction graph , 2015 .

[31]  Shahriar Akter,et al.  How ‘Big Data’ Can Make Big Impact: Findings from a Systematic Review and a Longitudinal Case Study , 2015 .

[32]  Angappa Gunasekaran,et al.  The impact of big data on world-class sustainable manufacturing , 2015, The International Journal of Advanced Manufacturing Technology.

[33]  Shouyang Wang,et al.  Information and decision-making delays in MRP, KANBAN, and CONWIP , 2014 .

[34]  Asli Yagmur Akbulut,et al.  The role of ERP tools in supply chain information sharing, cooperation, and cost optimization , 2005 .

[35]  Monideepa Tarafdar,et al.  Supply chain information systems strategy: Impacts on supply chain performance and firm performance , 2014 .

[36]  Hojung Shin,et al.  Manufacturing planning and control: The evolution of MRP and JIT integration , 1998, Eur. J. Oper. Res..

[37]  Angappa Gunasekaran,et al.  World-class sustainable manufacturing: framework and a performance measurement system , 2015 .

[38]  Sengun Yeniyurt,et al.  THE IMPACT OF INFORMATION TECHNOLOGY ON SUPPLY CHAIN CAPABILITIES AND FIRM PERFORMANCE: A RESOURCE-BASED VIEW , 2006 .

[39]  Wei Du,et al.  An optimization method for shopfloor material handling based on real-time and multi-source manufacturing data , 2015 .

[40]  A. Gunasekaran,et al.  Big data analytics in logistics and supply chain management: Certain investigations for research and applications , 2016 .

[41]  M. Taisch,et al.  The value of Big Data in servitization , 2015 .

[42]  Edward W. N. Bernroider,et al.  The performance of contingencies of supply chain information integration: The roles of product and market complexity , 2015 .

[43]  Hau L. Lee,et al.  Mitigating supply chain risk through improved confidence , 2004 .

[44]  John B. Kidd,et al.  Toyota Production System (2nd edition) , 1995 .

[45]  Anders Segerstedt Master Production Scheduling and a comparison of Material Requirements Planning and cover-time planning , 2005 .

[46]  Milton Harris,et al.  Organization Design , 2000, Manag. Sci..

[47]  R. Radner The organization of decentralized information processing , 1993 .

[48]  A. Oke,et al.  Antecedents of supply chain visibility in retail supply chains: A resource-based theory perspective , 2007 .