Impact of Prognostic Uncertainty in System Health Monitoring

Across many industries, systems are exceeding their intended design lives, whether they are ships, bridges or military aircraft. As a result failure rates can increase and unanticipated wear or failure conditions can arise. Health monitoring research and application has the potential to more safely lengthen the service life of a range of systems through utilization of sensor data and knowledge of failure mechanisms to predict component life remaining. A further benefit of health monitoring when combined across an entire platform is system health management. System health management is an enabler of condition based maintenance, which allows repair or replacement based on material condition, not a set time. Replacement of components based on condition can enable cost savings through fewer parts being used and the associated maintenance costs. The goal of this research is to show the management of system health can provide savings in maintenance and logistics cost while increasing vehicle availability through the approach of condition based maintenance. This work examines the impact of prediction accuracy uncertainty in remaining useful life prognostics for a squadron of 12 aircraft. The uncertainty in this research is introduced in the system through an uncertainty factor applied to the useful life prediction. An ARENA discrete event simulation is utilized to explore the effect of prediction error on availability, reliability, and maintenance and logistics processes. Aircraft are processed through preflight, flight, and post-flight operations, as well as maintenance and logistics activities. A baseline case with traditional time driven maintenance is performed for comparison to the condition based maintenance approach of this research. aircraft and manpower. The occurrence and impact of false alarms on system performance is examined. The results show the potential availability, reliability, and maintenance benefits of a health monitoring system and explore the diagnostic uncertainty.

[1]  Mark E. Thomas,et al.  IMPROVING SYSTEM MAINTENANCE DECISIONS: A VALUE OF INFORMATION FRAMEWORK , 1999 .

[2]  M. Glade,et al.  Life cycle cost impact of using prognostic health management (PHM) for helicopter avionics , 2007, Microelectron. Reliab..

[3]  Khairuddin Abdul Rashid,et al.  Life cycle cost , 2016 .

[4]  Raphael T. Haftka,et al.  Effects of Uncertainty Reduction Measures by Structural Health Monitoring on Safety and Lifecycle Costs of Aircrafts , 2010 .

[5]  Byron A. Ellis,et al.  Life Cycle Cost , 2007 .

[6]  I. Turner,et al.  On Quantifying Cost-Benefit of ISHM in Aerospace Systems , 2007, 2007 IEEE Aerospace Conference.

[7]  K. Goebel,et al.  Analytical algorithms to quantify the uncertainty in remaining useful life prediction , 2013, 2013 IEEE Aerospace Conference.

[8]  Leonardo Ramos Rodrigues,et al.  Spare Parts Inventory Control for Non-Repairable Items Based on Prognostics and Health Monitoring Information , 2012 .

[9]  Dennis Patrick Roach,et al.  Real time crack detection using mountable comparative vacuum monitoring sensors. , 2008 .

[10]  Liliane Pintelon,et al.  Quantifying the added value of an imperfectly performing condition monitoring system - Application to a wind turbine gearbox , 2013, Reliab. Eng. Syst. Saf..

[11]  Amrita Kumar,et al.  Design of Integrated SHM System for Commercial Aircraft Applications , 2005 .

[12]  David Goldberg,et al.  The Fix We’re In For: The State of Our Nation’s Bridges 2013 , 2011 .

[13]  U. S. Army Methodology for Estimation of Operational Availability as Applied to Military Systems , 2010 .

[14]  Jerome P. Lynch,et al.  Sensor technology innovation for the advancement of structural health monitoring: a strategic program of US-China research for the next decade , 2007 .

[15]  T. Yoneyama,et al.  Maintenance Planning Optimization Based on PHM Information and Spare Parts Availability , 2013 .

[16]  Byron A. Ellis,et al.  Condition Based Maintenance , 2008 .