Impact of Prognostic Uncertainty in System Health Monitoring
暂无分享,去创建一个
[1] Mark E. Thomas,et al. IMPROVING SYSTEM MAINTENANCE DECISIONS: A VALUE OF INFORMATION FRAMEWORK , 1999 .
[2] M. Glade,et al. Life cycle cost impact of using prognostic health management (PHM) for helicopter avionics , 2007, Microelectron. Reliab..
[3] Khairuddin Abdul Rashid,et al. Life cycle cost , 2016 .
[4] Raphael T. Haftka,et al. Effects of Uncertainty Reduction Measures by Structural Health Monitoring on Safety and Lifecycle Costs of Aircrafts , 2010 .
[5] Byron A. Ellis,et al. Life Cycle Cost , 2007 .
[6] I. Turner,et al. On Quantifying Cost-Benefit of ISHM in Aerospace Systems , 2007, 2007 IEEE Aerospace Conference.
[7] K. Goebel,et al. Analytical algorithms to quantify the uncertainty in remaining useful life prediction , 2013, 2013 IEEE Aerospace Conference.
[8] Leonardo Ramos Rodrigues,et al. Spare Parts Inventory Control for Non-Repairable Items Based on Prognostics and Health Monitoring Information , 2012 .
[9] Dennis Patrick Roach,et al. Real time crack detection using mountable comparative vacuum monitoring sensors. , 2008 .
[10] Liliane Pintelon,et al. Quantifying the added value of an imperfectly performing condition monitoring system - Application to a wind turbine gearbox , 2013, Reliab. Eng. Syst. Saf..
[11] Amrita Kumar,et al. Design of Integrated SHM System for Commercial Aircraft Applications , 2005 .
[12] David Goldberg,et al. The Fix We’re In For: The State of Our Nation’s Bridges 2013 , 2011 .
[13] U. S. Army. Methodology for Estimation of Operational Availability as Applied to Military Systems , 2010 .
[14] Jerome P. Lynch,et al. Sensor technology innovation for the advancement of structural health monitoring: a strategic program of US-China research for the next decade , 2007 .
[15] T. Yoneyama,et al. Maintenance Planning Optimization Based on PHM Information and Spare Parts Availability , 2013 .
[16] Byron A. Ellis,et al. Condition Based Maintenance , 2008 .