A mathematical Model to select the Risk Response Strategies of the Construction Projects: Case Study of Saba Tower

Abstract Uncertainties and risks are always associated with large real world projects and may obstacle and threaten projects in some ways. Failure in accurately identifying the project risks increases the total cost and may cause social and environmental damages as well as casualties during project execution. The aim of this study is to develop a mathematical programming model for selecting risk response strategies for construction projects. All risk response strategies for the analysed project have been identified and a mathematical model is presented based on project iron triangle; time, cost and quality to obtain the optimal risk response strategy for the construction project.

[1]  I Ben-David,et al.  An integrated approach for risk response development in project planning , 2001, J. Oper. Res. Soc..

[2]  Zhi-Ping Fan,et al.  An optimization method for selecting project risk response strategies , 2014 .

[3]  Junli Shi,et al.  A Modified Method for Risk Evaluation in Failure Mode and Effects Analysis , 2016 .

[4]  Chee Peng Lim,et al.  Application of the fuzzy Failure Mode and Effect Analysis methodology to edible bird nest processing , 2013 .

[5]  Osman Taylan,et al.  Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies , 2014, Appl. Soft Comput..

[6]  Yujie Lu,et al.  Developing a risk assessment method for complex pipe jacking construction projects , 2015 .

[7]  Tarek Zayed,et al.  Assessing risk and uncertainty inherent in Chinese highway projects using AHP , 2008 .

[8]  Hu-Chen Liu,et al.  Failure mode and effects analysis using fuzzy evidential reasoning approach and grey theory , 2011, Expert Syst. Appl..

[9]  B. Boehm Software risk management: principles and practices , 1991, IEEE Software.

[10]  M. Askari,et al.  An Integrated Method for Ranking of Risk in BOT Projects , 2014 .

[11]  Mesut Kumru,et al.  Fuzzy FMEA application to improve purchasing process in a public hospital , 2013, Appl. Soft Comput..

[12]  Behnam Vahdani,et al.  A new FMEA method by integrating fuzzy belief structure and TOPSIS to improve risk evaluation process , 2014, The International Journal of Advanced Manufacturing Technology.

[13]  Cristina Lopez,et al.  Risks Response Strategies for Supporting Practitioners Decision-Making in Software Projects , 2012 .

[14]  Ahmet Can Kutlu,et al.  Fuzzy failure modes and effects analysis by using fuzzy TOPSIS-based fuzzy AHP , 2012, Expert Syst. Appl..

[15]  Nalinee Chanamool,et al.  Fuzzy FMEA application to improve decision-making process in an emergency department , 2016, Appl. Soft Comput..

[16]  Mahmood Shafiee,et al.  An FMEA-Based Risk Assessment Approach for Wind Turbine Systems: A Comparative Study of Onshore and Offshore , 2014 .

[17]  Siamak Noori,et al.  An Integrated Methodology for Assessment and Selection of the Project Risk Response Actions , 2009, Risk analysis : an official publication of the Society for Risk Analysis.

[18]  Nigel J. Smith,et al.  Application of a fuzzy based decision making methodology to construction project risk assessment , 2007 .