Coordinated Collaboration of Multiagent Systems Based on Genetic Algorithms
暂无分享,去创建一个
[1] Daniel D. Corkill,et al. Hierarchical Planning in a Distributed Environment , 1979, IJCAI.
[2] Marie desJardins,et al. Controlling Communication in Distributed Planning Using Irrelevance Reasoning , 1998, AAAI/IAAI.
[3] Edmund H. Durfee,et al. A Survey of Research in Distributed, Continual Planning , 1999, AI Mag..
[4] Alain Cardon,et al. Genetic algorithms using multi-objectives in a multi-agent system , 2000, Robotics Auton. Syst..
[5] Marcel Schoppers,et al. Universal Plans for Reactive Robots in Unpredictable Environments , 1987, IJCAI.
[6] Victor R. Lesser,et al. Designing a Family of Coordination Algorithms , 1997, ICMAS.
[7] Philippe Laborie,et al. Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results , 2003, Artif. Intell..
[8] Sarit Kraus,et al. Collaborative Plans for Complex Group Action , 1996, Artif. Intell..
[9] L. Darrell Whitley,et al. A Comparison of Genetic Algorithms for the Static Job Shop Scheduling Problem , 2000, PPSN.
[10] Craig A. Knoblock. Planning, Executing, Sensing, and Replanning for Information Gathering , 1995, IJCAI.
[11] Melanie Mitchell,et al. An introduction to genetic algorithms , 1996 .
[12] Jacek Blazewicz,et al. Scheduling in Computer and Manufacturing Systems , 1990 .
[13] Hsiao-Lan Fang,et al. Genetic algorithms in timetabling and scheduling , 1995 .
[14] Isao Ono,et al. An Efficient Genetic Algorithm for Job Shop Scheduling Problems , 1995, International Conference on Genetic Algorithms.
[15] Gerhard Weiss,et al. Multiagent systems: a modern approach to distributed artificial intelligence , 1999 .
[16] David E. Wilkins,et al. A Multiagent Planning Architecture , 1998, AIPS.
[17] Edmund H. Durfee,et al. Partial global planning: a coordination framework for distributed hypothesis formation , 1991, IEEE Trans. Syst. Man Cybern..
[18] Jacques Ferber,et al. Multi-agent systems - an introduction to distributed artificial intelligence , 1999 .
[19] Johann L. Hurink,et al. Tabu search for the job-shop scheduling problem with multi-purpose machines , 1994 .