A heuristic for production scheduling and inventory control in the presence of sequence-dependent setup times
暂无分享,去创建一个
[1] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[2] Jeremy F. Shapiro,et al. Mathematical programming models and methods for production planning and scheduling , 1988 .
[3] Robert C. Leachman,et al. A general framework for modeling production , 1989 .
[4] Clyde L. Monma,et al. On the Complexity of Scheduling with Batch Setup Times , 1989, Oper. Res..
[5] Thomas L. Magnanti,et al. A Strong Cutting Plane Algorithm for Production Scheduling with Changeover Costs , 1990, Oper. Res..
[6] James Evans,et al. Optimization algorithms for networks and graphs , 1992 .
[7] R. Sargent,et al. A general algorithm for short-term scheduling of batch operations */I , 1993 .
[8] Jeremy F. Shapiro,et al. Chapter 8 Mathematical programming models and methods for production planning and scheduling , 1993, Logistics of Production and Inventory.
[9] R. Sargent,et al. A general algorithm for short-term scheduling of batch operations—II. Computational issues , 1993 .
[10] Stéphane Dauzère-Pérès,et al. An Integrated Approach in Production Planning and Scheduling , 1994 .
[11] G. Reklaitis,et al. HEURISTIC ALGORITHM FOR SCHEDULING BATCH AND SEMI-CONTINUOUS PLANTS WITH PRODUCTION DEADLINES, INTERMEDIATE STORAGE LIMITATIONS AND EQUIPMENT CHANGEOVER COSTS , 1994 .
[12] I. M. Ovacikt,et al. Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times , 1994 .
[13] Reha Uzsoy,et al. Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times. , 1995 .
[14] Reha Uzsoy,et al. Rescheduling on a single machine with part-type dependent setup times and deadlines , 1997, Ann. Oper. Res..
[15] R. González,et al. Fast Computational Procedure for Solving Multi-Item Single-Machine Lot Scheduling Optimization Problems , 1997 .