Configuration of a Multi-use Battery Production
暂无分享,去创建一个
[1] Hans-Peter Wiendahl,et al. Planung modularer Fabriken: Vorgehen und Beispiele aus der Praxis , 2005 .
[2] Dominik T. Matt,et al. Factors Affecting Future Scenarios for Alternative Vehicles Market , 2012 .
[3] Philip A. Roussel,et al. Management der F&E-Strategie , 1991 .
[4] Torsten J. Gerpott,et al. Strategisches Technologie- und Innovationsmanagement , 2005 .
[5] Stephen C. Graves,et al. Equipment selection and task assignment for multiproduct assembly system design , 1988 .
[6] Michal Tzur,et al. Design of flexible assembly line to minimize equipment cost , 2000 .
[7] Stephen C. Graves,et al. An Integer Programming Procedure for Assembly System Design Problems , 2011, Oper. Res..
[8] Peter A. Pinto,et al. Assembly Line Balancing with Processing Alternatives: An Application , 1983 .
[9] Christoph Beckmann,et al. F&E-Management , 1996 .
[10] Nigel P. Brandon,et al. Comparative analysis of battery electric, hydrogen fuel cell and hybrid vehicles in a future sustainable road transport system , 2010 .
[11] Hans-Jörg Bullinger. Was ist Technikfolgenabschätzung , 1994 .
[12] Henning Wallentowitz,et al. Strategien zur Elektrifizierung des Antriebstranges , 2010 .
[13] Sha Li,et al. Designing Productive Assembly System Configurations Based on Hierarchical Subassembly Decomposition with Application to Automotive Battery Packs. , 2012 .