The Role of Out-of-Market Corrections in Day-Ahead Scheduling
暂无分享,去创建一个
[1] A. Papalexopoulos. Theoretical and practical considerations in implementing and using a reliability unit commitment (RUC) in restructured electricity markets , 2006, 2006 IEEE Power Engineering Society General Meeting.
[2] Kory W. Hedman,et al. Locational Reserve Disqualification for Distinct Scenarios , 2015, IEEE Transactions on Power Systems.
[3] Robin Broder Hytowitz,et al. Market implications of reliability unit commitment formulations for Day-Ahead scheduling , 2014, 2014 IEEE PES General Meeting | Conference & Exposition.
[4] Allen J. Wood,et al. Power Generation, Operation, and Control , 1984 .
[5] Fengyu Wang,et al. Reserve zone determination based on statistical clustering methods , 2012, 2012 North American Power Symposium (NAPS).
[6] Anthony Papavasiliou,et al. A comparative study of stochastic unit commitment and security-constrained unit commitment using high performance computing , 2013, 2013 European Control Conference (ECC).
[7] Kory W. Hedman,et al. Analyzing the impacts of out-of-market corrections , 2013, 2013 IREP Symposium Bulk Power System Dynamics and Control - IX Optimization, Security and Control of the Emerging Power Grid.
[8] Shmuel S. Oren. Oral discussions on Session: “Markets” - Part II , 2013 .
[9] Kory W Hedman,et al. Co-Optimization of Generation Unit Commitment and Transmission Switching With N-1 Reliability , 2010, IEEE Transactions on Power Systems.
[10] Alex D. Papalexopoulos,et al. Market design for the simultaneous optimization of the Day-Ahead market and the reliability unit commitment applications , 2013, 2013 IREP Symposium Bulk Power System Dynamics and Control - IX Optimization, Security and Control of the Emerging Power Grid.