Strengthening, modification and repair techniques' prioritization for structural integrity control of ageing offshore structures

Structural integrity control is vital for existing ageing as well as newly built offshore and onshore structures. Structural integrity control becomes highly sensitive to interventions under a potential loss of structural integrity when it comes to offshore oil and gas production and process facilities. This is mainly due to the inherent constraints present in carrying out engineering work in the offshore atmosphere. It has been further exacerbated by the ageing offshore structures and the necessity of carrying out life extension toward the end of their design service lives. Local and international regulations demand the implementation of appropriate strengthening, modification and repair plans when significant changes in the structural integrity are revealed. In this context, strengthening, modification and repair techniques such as welding, member removal/reduction of loading, mechanical clamping and grouted repairs play a vital role. This manuscript presents an approach for prioritizing the strengthening, modification and repair techniques using a multi-criteria analysis approach. An analytic hierarchy process has been selected for the analysis via an illustrative case. It also provides a comprehensive overview of currently existing; strengthening, modification and repair techniques and their comparative pros and cons.

[1]  Stephen N. Luko,et al.  Risk Management Principles and Guidelines , 2013 .

[2]  R. M. Chandima Ratnayake,et al.  Structural Integrity Control of Ageing Offshore Structures: Repairing and Strengthening With Grouted Connections , 2013 .

[3]  Marcus Klose,et al.  Grouted Connections - Offshore Standards Driven By the Wind Industry , 2012 .

[4]  Claudio M. Rocco Sanseverino,et al.  Robustness and sensitivity analysis in multiple criteria decision problems using rule learner techniques , 2015, Reliab. Eng. Syst. Saf..

[5]  R. M. Chandima Ratnayake,et al.  A decision model for executing plant strategy: maintaining the technical integrity of petroleum flowlines , 2012 .

[6]  A. Stacey,et al.  Structural Integrity Management Framework for Fixed Jacket Structures , 2008 .

[7]  Dan M. Frangopol,et al.  Minimum expected cost-oriented optimal maintenance planning for deteriorating structures: application to concrete bridge decks , 2001, Reliab. Eng. Syst. Saf..

[8]  Siamak Parsanejad Strength of Grout-Filled Damaged Tubular Members , 1987 .

[9]  L. Greene EHPnet: United Nations Framework Convention on Climate Change , 2000, Environmental Health Perspectives.

[10]  Ailbhe Travers,et al.  Compendium on methods and tools to evaluate impacts of, and vulnerability and adaptation to, climate change , 2008 .

[11]  Eddie W.L. Cheng,et al.  Information priority-setting for better resource allocation using analytic hierarchy process (AHP) , 2001, Inf. Manag. Comput. Secur..

[12]  R. M. Chandima Ratnayake,et al.  Modelling of asset integrity management process: a case study for computing operational integrity preference weights , 2012 .

[13]  Torgeir Moan,et al.  Fatigue reliability analysis of the jacket support structure for offshore wind turbine considering the effect of corrosion and inspection , 2012, Reliab. Eng. Syst. Saf..

[14]  Robert G. Bea Human and organization factors: engineering operating safety into offshore structures , 1998 .

[15]  Supersedes Ansi,et al.  Specification for Underwater Welding , 1999 .

[16]  Gerhard Ersdal,et al.  New Standard for Assessment of Structural Integrity for Existing Load-Bearing Structures-Norsok N-006 , 2009 .

[17]  Ingar Scherf,et al.  Cost-Efficient Structural Upgrade and Life Extension of Ekofisk Platforms with Use of Modern Reassessment Techniques , 2001 .

[18]  T. Saaty How to Make a Decision: The Analytic Hierarchy Process , 1990 .

[19]  R. M. Chandima Ratnayake,et al.  An algorithm to prioritize welding quality deterioration factors: A case study from a piping component fabrication process , 2013 .

[20]  Gerhard Ersdal,et al.  Assessment of existing offshore structures for life extension , 2005 .

[21]  Tugrul U. Daim,et al.  Technology assessment for clean energy technologies: The case of the Pacific Northwest , 2009 .

[22]  R. M. Chandima Ratnayake,et al.  Translating sustainability concerns at plant level asset operations: industrial performance assessment , 2012 .

[23]  Enrico Zio,et al.  On the use of the analytic hierarchy process in the aggregation of expert judgments , 1996 .

[24]  Marcello Braglia,et al.  The analytic hierarchy process applied to maintenance strategy selection , 2000, Reliab. Eng. Syst. Saf..

[25]  Eigil V. Sørensen,et al.  Fatigue Life of High Performance Grout for Wind Turbine Grouted Connection in Wet or Dry Environment , 2011 .

[26]  Masoud Rabiei,et al.  A probabilistic-based airframe integrity management model , 2009, Reliab. Eng. Syst. Saf..

[27]  Ernest H. Forman,et al.  Decision by Objectives , 2001 .

[28]  J. V. Sharp,et al.  Structural Integrity Monitoring: Review and Appraisal of Current Technologies for Offshore Applications , 2008 .

[29]  Henrik Grigorian,et al.  Strengthening of Offshore Steel Components Using High-Strength Grout: Component Testing and Analytical Methods , 2001 .

[30]  Masoud Rabiei,et al.  A recursive Bayesian framework for structural health management using online monitoring and periodic inspections , 2013, Reliab. Eng. Syst. Saf..

[31]  Lotta Hallbeck,et al.  Microbial Analyses of Cement and Grouting Additives , 2012 .

[32]  Kwai-Sang Chin,et al.  An AHP based study of critical factors for TQM implementation in Shanghai manufacturing industries , 2002 .

[33]  Poong-Hyun Seong,et al.  A method for risk-informed safety significance categorization using the analytic hierarchy process and bayesian belief networks , 2004, Reliab. Eng. Syst. Saf..

[34]  R. M. Chandima Ratnayake,et al.  Asset integrity management for sustainable industrial operations: measuring the performance , 2012 .

[35]  Ingar Scherf,et al.  Cost-Efficient Structural Upgrade and Life Extension of North Sea Jacket Platforms With Use of Modern Reassessment Techniques , 1999 .

[36]  Armin Scholl,et al.  Solving multiattribute design problems with analytic hierarchy process and conjoint analysis: An empirical comparison , 2005, Eur. J. Oper. Res..

[37]  J. N. Sørensen,et al.  Safety culture: a survey of the state-of-the-art , 2002, Reliab. Eng. Syst. Saf..

[38]  Sven Ove Hansson,et al.  Principles of engineering safety: Risk and uncertainty reduction , 2008, Reliab. Eng. Syst. Saf..

[39]  Ben Graybeal Material Characterization of Field-Cast Connection Grouts , 2013 .

[40]  R. M. Chandima Ratnayake,et al.  Implementing company policies in plant level asset operations: measuring organisational alignment , 2010 .

[41]  R. M. Chandima Ratnayake,et al.  Technical integrity management: measuring HSE awareness using AHP in selecting a maintenance strategy , 2010 .

[42]  A. F. Dier Background to New Design Manual for Platform Strengthening, Modification and Repair , 1996 .

[43]  R. M. Chandima Ratnayake,et al.  KBE development for criticality classification of mechanical equipment: a fuzzy expert system , 2014 .

[44]  Dimitri V. Val,et al.  Decision analysis for deteriorating structures , 2005, Reliab. Eng. Syst. Saf..