Event-Driven Process Chain for Modeling and Verification of Business Requirements–A Systematic Literature Review
暂无分享,去创建一个
Farooque Azam | Wasi Haider Butt | Muhammad Rashid | Muhammad Waseem Anwar | Anam Amjad | Anam Amjad | F. Azam | M. Rashid
[1] Deng Shengchun,et al. Business process modeling for SCM systems , 2008, 2008 4th International Conference on Emerging Technologies.
[2] Jorge Oliveira e Sá,et al. A multi-driven approach to requirements analysis of data warehouse model: A case study , 2012 .
[3] Christoph Schneider,et al. Petri Net Based Certification of Event-Driven Process Chains , 1998, ICATPN.
[4] Boudewijn F. van Dongen,et al. Verification of EPCs: Using Reduction Rules and Petri Nets , 2005, CAiSE.
[5] Marion Murzek,et al. Structural Patterns for the Transformation of Business Process Models , 2006, 2006 10th IEEE International Enterprise Distributed Object Computing Conference Workshops (EDOCW'06).
[6] Boudewijn F. van Dongen,et al. ProM 4.0: Comprehensive Support for Real Process Analysis , 2007, ICATPN.
[7] Jörg Dörr,et al. EPC vs. UML Activity Diagram - Two Experiments Examining their Usefulness for Requirements Engineering , 2009, 2009 17th IEEE International Requirements Engineering Conference.
[8] Xia Wang,et al. Research on Flexible Business Process of Bank Modeling Based on EPC , 2015, MUE 2015.
[9] Iris Reinhartz-Berger,et al. Extending the Adaptability of Reference Models , 2010, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.
[10] Yan Jun-wei,et al. Analysis of mapping form EPC model to workflow model , 2006 .
[11] Jan Mendling,et al. Understanding the Occurrence of Errors in Process Models Based on Metrics , 2007, OTM Conferences.
[12] Jan Mendling,et al. Preserving correctness during business process model configuration , 2010, Formal Aspects of Computing.
[13] Stefan Junginger. The Workflow Management Coalition Standard WPDL: First Steps towards Formalization , 2000 .
[14] Brenda Scholtz,et al. Composite, Real-time Validation for Business Process Modelling , 2014, SAICSIT '14.
[15] Yuan-Chen Yu,et al. A Parametric Event-Driven Flowed Token Petri Nets for Generic Agile Systems Modeling and Control , 2006, 2006 IEEE International Conference on Systems, Man and Cybernetics.
[16] Giancarlo Guizzardi,et al. An ontology-based semantic foundation for ARIS EPCs , 2010, SAC '10.
[17] Wil M. P. van der Aalst,et al. Formalization and verification of event-driven process chains , 1999, Inf. Softw. Technol..
[18] Christian Müller,et al. A Tool For A Flexible Posterior Analysis Of Simulation Experiments , 2015, ECMS.
[19] Mark Strembeck,et al. On the Cognitive Effectiveness of Routing Symbols in Process Modeling Languages , 2010, BIS.
[20] Peter Fettke,et al. Collaborative Business Process Modeling with CoMoMod - A Toolkit for Model Integration in Distributed Cooperation Environments , 2011, 2011 IEEE 20th International Workshops on Enabling Technologies: Infrastructure for Collaborative Enterprises.
[21] Jan Mendling,et al. Generating correct EPCs from configured C-EPCs , 2006, SAC '06.
[22] Manuel Wimmer,et al. Applying Model Transformation By-Example on Business Process Modeling Languages , 2007, ER Workshops.
[23] Olga Levina. Assessing Information Loss in EPC to BPMN Business Process Model Transformation , 2012, 2012 IEEE 16th International Enterprise Distributed Object Computing Conference Workshops.
[24] Patrick Delfmann,et al. Towards an EPC Standardization - A Literature Review on Exchange Formats for EPC Models , 2016, MKWI.
[25] Dong Wang,et al. An RFID Middleware Business Process Integration Framework Based on EPC Modeling and Complex Event Processing , 2009, 2009 Fourth International Conference on Computer Sciences and Convergence Information Technology.
[26] Karsten Wolf,et al. Transforming BPEL to Petri Nets , 2005, Business Process Management.
[27] Jan Mendling,et al. Detection and prediction of errors in EPCs of the SAP reference model , 2008, Data Knowl. Eng..
[28] Joaquín Nicolás,et al. Transforming the OOram three-model architecture into a UML-based process , 2001, Proceedings of the 34th Annual Hawaii International Conference on System Sciences.
[29] João P. Vilela,et al. Privacy-Preserving Data Mining: Methods, Metrics, and Applications , 2017, IEEE Access.
[30] Edward A. Lee. Constructive Models of Discrete and Continuous Physical Phenomena , 2014, IEEE Access.
[31] Walid Gaaloul,et al. A semantic framework for configurable business process as a service in the cloud , 2016, J. Netw. Comput. Appl..
[32] Volker Hoyer,et al. Collaborative e-Business Process Modelling: Transforming Private EPC to Public BPMN Business Process Models , 2007, Business Process Management Workshops.
[33] Michael Schrefl,et al. Modelling Inter-Process Dependencies with High-Level Business Process Modelling Languages , 2008, APCCM.
[34] August-Wilhelm Scheer,et al. ARIS Architecture and Reference Models for Business Process Management , 2000, Business Process Management.
[35] Ekkart Kindler,et al. On the semantics of EPCs: Resolving the vicious circle , 2006, Data Knowl. Eng..
[36] Veronika Stefanov,et al. A performance measurement perspective for event-driven process chains , 2005, 16th International Workshop on Database and Expert Systems Applications (DEXA'05).
[37] Jörg Dörr,et al. Investigating the usefulness of notations in the context of requirements engineering , 2012, 2012 Second IEEE International Workshop on Empirical Requirements Engineering (EmpiRE).
[38] Peter Loos,et al. Towards an Extended Metamodel of Event-Driven Process Chains to Model Complex Event Patterns , 2015, ER Workshops.
[39] Jun Han,et al. EPClets - A Lightweight and Flexible Textual Language to Augment EPC Process Modelling , 2014, 2014 IEEE International Conference on Services Computing.
[40] Peter Loos,et al. Towards A Minimal Cost Of Change Approach For Inductive Reference Model Development , 2013, ECIS.
[41] Andreas Winter,et al. Using GXL for exchanging business process models , 2006, Inf. Syst. E Bus. Manag..
[42] Wei-Hao Chen,et al. Integration of EPC and a modularized colored Petri net through events for agile manufacturing cell control , 2004, IEEE International Conference on Networking, Sensing and Control, 2004.
[43] Hajo A. Reijers,et al. A Systematic Evaluation of Enterprise Modelling Approaches on Their Applicability to Automatically Generate ERP Software , 2016, 2016 IEEE 18th Conference on Business Informatics (CBI).
[44] Kees M. van Hee,et al. Colored Petri Nets to Verify Extended Event-Driven Process Chains , 2005, OTM Conferences.
[45] Jörg Ziemann,et al. Towards Tool Support for Integrated Modeling of Private and Public Business Processes , 2007, 16th IEEE International Workshops on Enabling Technologies: Infrastructure for Collaborative Enterprises (WETICE 2007).
[46] Hongming Cai,et al. Multi-view service-oriented rule merged business process modeling framework , 2011, Proceedings of 2011 IEEE 6th International Symposium on Service Oriented System (SOSE).
[47] Peter Loos,et al. Object-orientation in business process modeling through applying event driven process chains (EPC) in UML , 1998, Proceedings Second International Enterprise Distributed Object Computing (Cat. No.98EX244).
[48] Jan Mendling,et al. On the Correlation between Process Model Metrics and Errors , 2007, ER.
[49] Andreas Speck,et al. Applying model checking to workflow verification , 2004, Proceedings. 11th IEEE International Conference and Workshop on the Engineering of Computer-Based Systems, 2004..
[50] Jan Mendling,et al. Structural Patterns for Soundness of Business Process Models , 2006, 2006 10th IEEE International Enterprise Distributed Object Computing Conference (EDOC'06).
[51] Jan Mendling,et al. Event-Driven Process Chains (EPC) , 2008 .
[52] Wil M.P. van der Aalst,et al. Getting rid of OR-joins and multiple start events in business process models , 2008, Enterp. Inf. Syst..
[53] Peter Loos,et al. Comparing the Control-Flow of EPC and Petri Net from the End-User Perspective , 2005, Business Process Management.
[54] Beate List,et al. A UML 2 Profile for Event Driven Process Chains , 2006, CONFENIS.
[55] Stipe Celar,et al. Use of Method for Elicitation, Documentation, and Validation of Software User Requirements (MEDoV) in Agile Software Development Projects , 2014, 2014 Sixth International Conference on Computational Intelligence, Communication Systems and Networks.
[56] Markus Nüttgens,et al. Extending different Business Process Modeling Languages with Domain Specific Concepts: The Case of Internal Controls in EPC and BPMN , 2015, EMISA.
[57] Jan Mendling. Verification of EPC Soundness , 2008 .
[58] Farooque Azam,et al. Verification of Event-Driven Process Chain with Timed Automata and Time Petri Nets , 2017, 2017 9th IEEE-GCC Conference and Exhibition (GCCCE).
[59] Jan Mendling,et al. Transformation of yEPC business process models to YAWL , 2006, SAC.
[60] Christian M. Schweda,et al. Providing EA decision support for stakeholders by automated analyses , 2015, DEC.
[61] Michael Schrefl,et al. Automated Construction of Process Goal Trees from EPC-Models to Facilitate Extraction of Process Patterns , 2009, ICEIS.
[62] Marjan Hericko,et al. An empirical investigation of intuitive understandability of process diagrams , 2016, Comput. Stand. Interfaces.
[63] Jörg Becker,et al. On the de-facto Standard of Event-driven Process Chains: How EPC is defined in Literature , 2016, Modellierung.
[64] Peter Loos,et al. Process Modelling Approach for Collaboration Networks , 2006, 15th IEEE International Workshops on Enabling Technologies: Infrastructure for Collaborative Enterprises (WETICE'06).
[65] Jan Mendling,et al. Getting Rid of the OR-Join in Business Process Models , 2007, 11th IEEE International Enterprise Distributed Object Computing Conference (EDOC 2007).
[66] Heiko Kern,et al. Model interoperability between meta-modeling environments by using m3-level-based bridges , 2016 .
[67] H. Krallmann,et al. Process-oriented Knowledge Management within the Product Change Systems of the Automotive Industry , 2015 .
[68] Boudewijn F. van Dongen,et al. The ProM Framework: A New Era in Process Mining Tool Support , 2005, ICATPN.
[69] Marc Born,et al. Towards executable models: transforming EDOC behavior models to CORBA and BPEL , 2004, Proceedings. Eighth IEEE International Enterprise Distributed Object Computing Conference, 2004. EDOC 2004..
[70] Jan Mendling,et al. From Inter-organizational Workflows to Process Execution: Generating BPEL from WS-CDL , 2005, OTM Workshops.
[71] Jan Mendling,et al. On the Syntax of Reference Model Configuration - Transforming the C-EPC into Lawful EPC Models , 2005, Business Process Management Workshops.
[72] J. Krogstie,et al. Formalization and verification of EPCs with OR-joins based on state and context , 2007 .
[73] Wil M. P. van der Aalst,et al. A configurable reference modelling language , 2007, Inf. Syst..
[74] Oliver Thomas,et al. Using Process Models for the Design of Service-Oriented Architectures: Methodology and E-Commerce Case Study , 2008, Proceedings of the 41st Annual Hawaii International Conference on System Sciences (HICSS 2008).
[75] Frank Hermann,et al. Modeling and reconfiguration of critical business processes for the purpose of a Business Continuity Management respecting security, risk and compliance requirements at Credit Suisse using algebraic graph transformation , 2009, 2009 13th Enterprise Distributed Object Computing Conference Workshops.
[76] Volker Gruhn,et al. A Comparison of Soundness Results Obtained by Different Approaches , 2009, Business Process Management Workshops.
[77] Sven Feja,et al. Model Checking with Graphical Validation Rules , 2008, 15th Annual IEEE International Conference and Workshop on the Engineering of Computer Based Systems (ecbs 2008).
[78] Ekkart Kindler,et al. On the semantics of EPCs: Efficient calculation and simulation , 2005, EPK.
[79] Remco M. Dijkman,et al. Petri Net Transformations for Business Processes - A Survey , 2009, Trans. Petri Nets Other Model. Concurr..
[80] William M. Tepfenhart,et al. EPC Workflow Model to WIFA Model Conversion , 2006, 2006 IEEE International Conference on Systems, Man and Cybernetics.
[81] Eva Söderström,et al. Towards a Framework for Comparing Process Modelling Languages , 2002, CAiSE.
[82] Stipe Celar,et al. Method for elicitation, documentation and validation of software user requirements (MEDoV) , 2013, 2013 IEEE Symposium on Computers and Communications (ISCC).
[83] Remco M. Dijkman,et al. Semantics and analysis of business process models in BPMN , 2008, Inf. Softw. Technol..
[84] Jan Mendling,et al. Instantiation Semantics for Process Models , 2008, BPM.
[85] Hongming Cai,et al. A business process modeling approach based on Semantic Event-driven Process Chains , 2010, The 2010 14th International Conference on Computer Supported Cooperative Work in Design.
[86] Maria-Eugenia Iacob,et al. Feasibility of EPC to BPEL Model Transformations Based on Ontology and Patterns , 2009, Business Process Management Workshops.
[87] Christian Mueller. Approaches To Run Simulations Of Business Processes In A Grid Computing Network , 2014, ECMS.
[88] Jan Mendling,et al. EPC markup language (EPML): an XML-based interchange format for event-driven process chains (EPC) , 2006, Inf. Syst. E Bus. Manag..
[89] Junliang Chen,et al. lightEPC: A Formal Approach for Modeling Personalized Lightweight Event-Driven Business Process , 2013, 2013 IEEE International Conference on Services Computing.
[90] Irfan Chishti,et al. Ontology mapping of business process modeling based on formal temporal logic , 2014 .
[91] Hafedh Mili,et al. Business process modeling languages: Sorting through the alphabet soup , 2010, CSUR.
[92] Tomas Bruckner,et al. Methodology for Modeling and Analysis of Business Processes (MMABP) , 2015 .
[93] Wil M. P. van der Aalst,et al. Merging Event-Driven Process Chains , 2008, OTM Conferences.
[94] Remco M. Dijkman,et al. Measuring Similarity between Business Process Models , 2008, CAiSE.
[95] Jan Mendling,et al. Yet Another Event-Driven Process Chain , 2005, Business Process Management.
[96] Katarzyna Grzybowska,et al. The modelling and design process of coordination mechanisms in the supply chain , 2017, J. Appl. Log..