The extended kanban control system for production coordination of assembly manufacturing systems
暂无分享,去创建一个
[1] J. A. Buzacott,et al. Queueing models of Kanban and MRP controlled production systems , 1989 .
[2] Y. Monden. Toyota Production System: Practical Approach to Production Management , 1983 .
[3] Yves Dallery,et al. A unified framework for pull control mechanisms in multi‐stage manufacturing systems , 2000, Ann. Oper. Res..
[4] Donald F. Towsley,et al. Equivalence, reversibility, symmetry and concavity properties in fork-join queuing networks with blocking , 1994, JACM.
[5] Donald F. Towsley,et al. Properties of fork/join queueing networks with blocking under various operating mechanisms , 1997, IEEE Trans. Robotics Autom..
[6] Geert Jan Olsder,et al. Synchronization and Linearity: An Algebra for Discrete Event Systems , 1994 .
[7] F. Baccelli,et al. Comparison properties of stochastic decision free Petri nets , 1992 .
[8] John A. Buzacott,et al. Stochastic models of manufacturing systems , 1993 .
[9] Yves Dallery,et al. Extended kanban control system: combining kanban and base stock , 2000 .