The number of measurements to be performed for time study analysis
暂无分享,去创建一个
[1] M. Raghavachari,et al. Single machine scheduling with coefficient of variation minimization , 1992 .
[2] George Kanawaty,et al. Introduction to work study , 1992 .
[3] Francis Mendez,et al. Bootstrap methods for analyzing time studies and input data for simulations , 2009 .
[4] Genichii Taguchi,et al. Introduction to quality engineering. designing quality into products a , 1986 .
[5] Fermín Mallor Giménez,et al. Optimising the service capacity by using a speed-up simulation , 2008 .
[6] C. R. Bector,et al. Sample Size Formula in Work Measurement under a Fuzzy Environment , 1994 .
[7] H. Sabatini.,et al. Productivity enhancement in the assembly line of a horn manufacturing company , 2010 .
[8] Robert Tibshirani,et al. An Introduction to the Bootstrap , 1994 .
[9] P Schuneman,et al. Master the 'ABCs' of activity-based costing. , 1997, Managed care.
[10] William G. Marchal,et al. Statistical techniques in business and economics , 1991 .
[11] Madhan Shridhar Phadke,et al. Quality Engineering Using Robust Design , 1989 .
[12] B. Niebel. Motion and Time Study , 1976 .
[13] B. Keren,et al. A wage incentive plan for branch managers using the DEA methodology , 2011 .
[14] Adam Abruzzi,et al. Formulating a Theory of Work Measurement , 1956 .
[15] Eddie Anderson,et al. Operations Management—Strategy and Analysis , 1987 .
[16] Mark Goh,et al. Operations Management activities and operational performance in service firms , 2007, Int. J. Serv. Technol. Manag..
[17] Mitchell M. Tseng,et al. A pragmatic approach to product costing based on standard time estimation , 1999 .
[18] Jianbiao Pan,et al. Optimization of engineering tolerance design using revised loss functions , 2009 .
[19] Anil Mital,et al. Simplifying the product maintenance process by building ease of maintenance into the design , 2011 .
[20] Andris Freivalds,et al. Methods, Standards and Work Design , 1998 .
[21] T. R. Bement,et al. Taguchi techniques for quality engineering , 1995 .
[22] Charles J. Malmborg,et al. Monte Carlo simulation based procedures for solving block layout problems , 2011 .
[23] John H. Sheesley,et al. Quality Engineering in Production Systems , 1988 .