The number of measurements to be performed for time study analysis

The setting of time standards by work measurement is costly and consumes much time and effort. Therefore, the aims are to minimise time measurements while guaranteeing that the measurements are sufficient to provide a required statistical precision. This paper presents two methods for determining the required number of cycles to be investigated in order to set time standards. The first method utilises the Pareto principle to compute the required number of cycles, taking into account the cumulative weight of the elements. The second method computes the number of measurements needed to ensure the required inaccuracy of the standard time of the entire cycle. The proposed methods compute the optimal number of measurements to be performed by also taking into account economic considerations. This is done by balancing the cost of performing extra measurements with the benefits achieved by reducing the inaccuracies in the final time standards. [Received 4 November 2011; Revised 2 February 2012; Revised 5 July 2012; Revised 10 October 2012; Accepted 10 October 2012]

[1]  M. Raghavachari,et al.  Single machine scheduling with coefficient of variation minimization , 1992 .

[2]  George Kanawaty,et al.  Introduction to work study , 1992 .

[3]  Francis Mendez,et al.  Bootstrap methods for analyzing time studies and input data for simulations , 2009 .

[4]  Genichii Taguchi,et al.  Introduction to quality engineering. designing quality into products a , 1986 .

[5]  Fermín Mallor Giménez,et al.  Optimising the service capacity by using a speed-up simulation , 2008 .

[6]  C. R. Bector,et al.  Sample Size Formula in Work Measurement under a Fuzzy Environment , 1994 .

[7]  H. Sabatini.,et al.  Productivity enhancement in the assembly line of a horn manufacturing company , 2010 .

[8]  Robert Tibshirani,et al.  An Introduction to the Bootstrap , 1994 .

[9]  P Schuneman,et al.  Master the 'ABCs' of activity-based costing. , 1997, Managed care.

[10]  William G. Marchal,et al.  Statistical techniques in business and economics , 1991 .

[11]  Madhan Shridhar Phadke,et al.  Quality Engineering Using Robust Design , 1989 .

[12]  B. Niebel Motion and Time Study , 1976 .

[13]  B. Keren,et al.  A wage incentive plan for branch managers using the DEA methodology , 2011 .

[14]  Adam Abruzzi,et al.  Formulating a Theory of Work Measurement , 1956 .

[15]  Eddie Anderson,et al.  Operations Management—Strategy and Analysis , 1987 .

[16]  Mark Goh,et al.  Operations Management activities and operational performance in service firms , 2007, Int. J. Serv. Technol. Manag..

[17]  Mitchell M. Tseng,et al.  A pragmatic approach to product costing based on standard time estimation , 1999 .

[18]  Jianbiao Pan,et al.  Optimization of engineering tolerance design using revised loss functions , 2009 .

[19]  Anil Mital,et al.  Simplifying the product maintenance process by building ease of maintenance into the design , 2011 .

[20]  Andris Freivalds,et al.  Methods, Standards and Work Design , 1998 .

[21]  T. R. Bement,et al.  Taguchi techniques for quality engineering , 1995 .

[22]  Charles J. Malmborg,et al.  Monte Carlo simulation based procedures for solving block layout problems , 2011 .

[23]  John H. Sheesley,et al.  Quality Engineering in Production Systems , 1988 .