Estimation of line efficiency by aggregation

In this paper multi-stage flow lines with intermediate buffers are approximated by two-stage lines by using repeated aggregation. The aggregation method uses restricted information of the output pattern of two-stage lines. The method is tested for the case where all production units are unreliable with exponential life-and repair-times. It appears that it performs well for most cases, provided we aggregate in the correct sequence.

[1]  Richard A. Murphy,et al.  Availability Characteristics of an Unbalanced Buffered Series Production System With Repair Priority , 1981 .

[2]  Rajan Suri,et al.  A variable buffer-size model and its use in analyzing closed queueing networks with blocking , 1986 .

[3]  J. A. Buzacott,et al.  AUTOMATIC TRANSFER LINES WITH BUFFER STOCKS , 1967 .

[4]  Hideo Miyahara,et al.  An Approximation Method for Open Restricted Queueing Networks , 1980, Oper. Res..

[5]  Genji Yamazaki,et al.  Reversibility of Tandem Blocking Queueing Systems , 1985 .

[6]  Yung-Li Lily Jow,et al.  An approximation method for tandem queues with blocking , 1988 .

[7]  J. Wijngaard The Effect of Interstage Buffer Storage on the Output of Two Unreliable Production Units in Series, with Different Production Rates , 1979 .

[8]  Harry G. Perros,et al.  Approximate analysis of open networks of queues with blocking: Tandem configurations , 1986, IEEE Transactions on Software Engineering.

[9]  T. Ohmi An Approximation for the Production Efficiency of Automatic Transfer Lines with In-Process Storages , 1981 .

[10]  Harry G. Perros,et al.  A survey of queueing networks with blocking part I , 1986 .

[11]  Richard A. Murphy Estimating the output of a series production system , 1978 .

[12]  John D. Perkins,et al.  The Availability of a System of Two Unreliable Machines Connected by an Intermediate Storage Tank , 1983 .

[13]  E. Koenigsberg Production Lines and Internal Storage—A Review , 1959 .

[14]  de Mbm René Koster,et al.  A Continuous Flow Model for Three Production Units in Series with Buffers , 1986 .

[15]  de Mbm René Koster Capacity analysis of two-stage production lines with many products , 1987 .

[16]  E. Muth The Reversibility Property of Production Lines , 1979 .

[17]  Adam Wolisz,et al.  Production rate optimization in a two-stage system with finite intermediate storage , 1984 .