Virtual design and construction

Abstract Virtual Design and Construction (VDC) is the use of integrated multi-disciplinary performance models of design-construction projects to support explicit and public business objectives. Professor Levitt’s Virtual Design Team (VDT) project provided a fundamental point of departure of this work: the organisation model provides a central theoretical and practical element in the VDC framework. VDC models are virtual because they are computer-based descriptions of the project. This paper summarises the VDC framework that integrates an organisation perspective with perspectives that are implicit in VDT, including 3D Building Information Model (BIM) product models of a product to be designed, built and operated – typically a physical facility – management by objectives, Lean production management and the social method of Integrated Concurrent Engineering (ICE). Thus, VDC project models emphasise those aspects of the project that can be designed and managed, i.e., the product (typically a building or plant facility), the organisation that will define, design, construct and operate it, and the process that the organisation teams will follow. Many companies and hundreds of professionals now use VDC methods, and they consistently find that they improve project and business performance.

[1]  A. R. Crathorne,et al.  Economic Control of Quality of Manufactured Product. , 1933 .

[2]  Biren Prasad,et al.  Concurrent Engineering Wheels , 1996 .

[3]  A. Hargadon Organizations in Action:Social Science Bases of Administrative Theory (Book) , 2003 .

[4]  Geoff Zeiss,et al.  Building Information Modeling , 2021, Wendehorst Bautechnische Zahlentafeln.

[5]  John Chachere,et al.  Cifecenter for Integrated Facility Engineering the Role of Reduced Latency in Integrated Concurrent Engineering the Role of Reduced Latency in Integrated, Concurrent Engineering , 2022 .

[6]  John Chachere,et al.  Cifecenter for Integrated Facility Engineering Observation, Theory, and Simulation of Integrated Concurrent Engineering: Grounded Theoretical Factors That Enable Radical Project Acceleration , 2022 .

[7]  Raymond E. Levitt,et al.  The virtual design team , 1998, CACM.

[8]  K. Law,et al.  CENTER FOR INTEGRATED FACILITY ENGINEEMNG , 2003 .

[9]  E. Rogers,et al.  Diffusion of innovations , 1964, Encyclopedia of Sport Management.

[10]  Yan Jin,et al.  Simulating Project Work Processes and Organizations: Toward a Micro-Contingency Theory of Organizational Design , 1999 .

[11]  P. Williams Practice management. , 2005, The Alpha omegan.

[12]  Milton Harris,et al.  Organization Design , 2000, Manag. Sci..

[13]  Denise Gravitt,et al.  Construction Safety , 2013 .

[14]  Gloria Mark,et al.  Extreme collaboration , 2002, CACM.

[15]  Raymond E. Levitt,et al.  Construction safety management , 1987 .

[16]  George S. Odiorne,et al.  Management Decisions by Objectives , 1968 .

[17]  Rick Best,et al.  Design and Construction: Building in Value , 2002 .

[18]  YAN JIN,et al.  The virtual design team: A computational model of project organizations , 1996, Comput. Math. Organ. Theory.

[19]  Howard W. Elkinton,et al.  Economic control of quality of manufactured product: by W. A. Shewhart, Ph.D., Member of the Technical Staff, Bell Telephone Laboratories, Inc., 501 pages, tables, diagrams, 8vo. New York, D. Van Nostrand Company, Inc., 1931. Price $6.50 , 1932 .

[20]  W. Edwards Deming,et al.  Out of the Crisis , 1982 .

[21]  R. M. Vazquez The Checklist Manifesto How to Get Things Right , 2011 .

[22]  Michael J. Prietula,et al.  The "Virtual Design Team": Simulating How Organization Structure and Information Processing Tools Affect Team Performance , 2014 .