The PDBO Algorithm for Discrete Time, Cost and Quality Trade -off in Software Projects with Expressing Quality by Defects

Abstract Software project manager's goal is getting an optimal allocation of time, cost and quality of each task/activity in the software project such that total time and cost of the project is minimized while project quality is maximized. Accordingly, mathematical and meta-heuristic algorithms have been developed in order to solve such riddle. This research paper introduces a new proposed meta-heuristic algorithm annotated as problem data based optimization (PDBO), which enjoys the fastness and achieves an optimal/near optimal solution for solving the discrete time- cost-quality trade-off problem (DTCQTP) in software projects. PDBO decides the preferred modes of performing tasks where task quality is expressed quantitatively in terms of its defects. Examples are given at the end to show the trade-off analysis between project's cost, time and quality.

[1]  J. Craggs Applied Mathematical Sciences , 1973 .

[2]  Mohammad Modarres,et al.  The Discrete Time-Cost-Quality Trade-off Problem Using a Novel Hybrid Genetic Algorithm , 2010 .

[3]  Anupam Shukla,et al.  Solving Travelling Salesman Problem Using Egyptian Vulture Optimization Algorithm - A New Approach , 2013, IIS.

[4]  Nalina Suresh,et al.  Project management with time, cost, and quality considerations , 1996 .

[5]  Remon F. Aziz,et al.  Time-Cost-Quality Trade-off Software by using Simplified Genetic Algorithm for Typical Repetitive Construction Projects , 2010 .

[6]  Hamed R. Tareghian,et al.  On the discrete time, cost and quality trade-off problem , 2006, Appl. Math. Comput..

[7]  Khaled A El-Rayes,et al.  Time-Cost-Quality Trade-Off Analysis for Highway Construction , 2005 .

[8]  Mohamed H. Rasmy,et al.  Multi-Objective Time-Cost Trade-Off Analysis in Critical Chain Project Networks Using Pareto Simulated Annealing , 2008 .

[9]  N. Ravi Shankar,et al.  Time, Cost and Quality Trade-off Analysis in Construction of Projects , 2011 .

[10]  Abbas Afshar,et al.  MULTI-OBJECTIVE OPTIMIZATION OF TIME-COST-QUALITY USING MULTI-COLONY ANT ALGORITHM , 2007 .

[11]  H. Iranmanesh,et al.  Finding Pareto Optimal Front for the Multi- Mode Time, Cost Quality Trade-off in Project Scheduling , 2008 .

[12]  Do Ba Khang,et al.  Time, cost and quality trade-off in project management: a case study , 1999 .

[13]  Erik Demeulemeester,et al.  New computational results on the discrete time/cost trade-off problem in project networks , 1998, J. Oper. Res. Soc..

[14]  Seyed Taghi Akhavan Niaki,et al.  Fuzzy Optimization in Cost, Time and Quality Trade-off in Software Projects with Quality Obtained by Fuzzy Rule Base , 2013 .

[15]  Hamed Shah-Hosseini,et al.  The intelligent water drops algorithm: a nature-inspired swarm-based optimization algorithm , 2009, Int. J. Bio Inspired Comput..

[16]  Reza Tavakkoli-Moghaddam,et al.  Time-Cost-Quality Trade-off in Project Scheduling with Linguistic Variables , 2012 .