Hybrid Neural Prediction and Optimized Adjustment for Coke Oven Gas System in Steel Industry
暂无分享,去创建一个
[1] Harald Haas,et al. Harnessing Nonlinearity: Predicting Chaotic Systems and Saving Energy in Wireless Communication , 2004, Science.
[2] Chonghun Han,et al. CONTROL OF GASHOLDER LEVEL BY TREND PREDICTION BASED ON TIME-SERIES ANALYSIS AND PROCESS HEURISTICS , 2003 .
[3] Jun Zhao,et al. Improved Echo State Network Based on Data-driven and Its Application to vskip0.3 baselineskip Prediction of Blast Furnace Gas Output: Improved Echo State Network Based on Data-driven and Its Application to vskip0.3 baselineskip Prediction of Blast Furnace Gas Output , 2009 .
[4] Min Han,et al. Support Vector Echo-State Machine for Chaotic Time-Series Prediction , 2007, IEEE Transactions on Neural Networks.
[5] Herbert Jaeger,et al. A tutorial on training recurrent neural networks , covering BPPT , RTRL , EKF and the " echo state network " approach - Semantic Scholar , 2005 .
[6] J. H. Kim,et al. A NOVEL MILP MODEL FOR PLANTWIDE MULTIPERIOD OPTIMIZATION OF BYPRODUCT GAS SUPPLY SYSTEM IN THE IRON-AND STEEL-MAKING PROCESS , 2003 .
[7] H. Jaeger,et al. Reservoir riddles: suggestions for echo state network research , 2005, Proceedings. 2005 IEEE International Joint Conference on Neural Networks, 2005..
[8] Gordon Lightbody,et al. Local Model Network Identification With Gaussian Processes , 2007, IEEE Transactions on Neural Networks.
[9] Witold Pedrycz,et al. Data Mining Methods for Knowledge Discovery , 1998, IEEE Trans. Neural Networks.
[10] J Zhao,et al. A Two-Stage Online Prediction Method for a Blast Furnace Gas System and Its Application , 2011, IEEE Transactions on Control Systems Technology.
[11] Amine Bermak,et al. Gaussian process for nonstationary time series prediction , 2004, Comput. Stat. Data Anal..
[12] Yoshikazu Nishikawa,et al. An optimal gas supply for a power plant using a mixed integer programming model , 1991, Autom..
[13] K. Aberer,et al. German National Research Center for Information Technology , 2007 .
[14] Gopal P. Sinha,et al. Strategic and Operational Management with Optimization at Tata Steel , 1995 .
[15] Rik Pintelon,et al. Learning neural networks with noisy inputs using the errors-in-variables approach , 2000, IEEE Trans. Neural Networks Learn. Syst..
[16] Chonghun Han,et al. Short-Term Multiperiod Optimal Planning of Utility Systems Using Heuristics and Dynamic Programming , 2001 .
[17] Robert C. Creese,et al. Supplier Selection Based on a Neural Network Model Using Genetic Algorithm , 2009, IEEE Transactions on Neural Networks.
[18] Senjian An,et al. Fast cross-validation algorithms for least squares support vector machine and kernel ridge regression , 2007, Pattern Recognit..
[19] Carl E. Rasmussen,et al. Gaussian processes for machine learning , 2005, Adaptive computation and machine learning.
[20] Wang Wei,et al. Improved Echo State Network Based on Data-driven and Its Application to Prediction of Blast Furnace Gas Output , 2009 .
[21] S. Sathiya Keerthi,et al. An efficient method for computing leave-one-out error in support vector machines with Gaussian kernels , 2004, IEEE Transactions on Neural Networks.