Method for integrating construction value engineering and computer readable medium storing a program thereof
暂无分享,去创建一个
The construction value engineering integrated management method and computer-readable program is stored to do this recording medium are disclosed. Combination Construction Value Engineering (Value Engineering: VE) data and the administrator data are stored VE project, DB, past VE proposals practices and VE integrated management methods to utilize VE Case DB past cases the data is stored, the response to the operation of the Administrator when the construction VE but create a project manager Construction VE and see when the project was created to bring the data stored in the VE project DB or VE Case DB and displaying a default data Construction VE projects, Construction VE projects are created by, in response to the operation of the administrator, but prepare for the project team and schedule based on the information stored in the VE project, DB, steps that administrators allowed the project team and schedule preparation only to the leader of construction VE project team, and configure the project team Once the plan is ready and schedules, in response to the operation of the project manager information input phase, the project features Analysis phase, the idea creation stage of the project, to proceed with the project assessment phase and the project proposal stage sequential By storing the result in VE Case DB, analyzing the construction VE project on the basis of the information stored in the VE Case DB and, to provide information to confirm the VE project manager to be in response to the operation of the manager include executing a construction project VE.