Literature Review on Planning Design and Engineering Activities in Shipbuilding

Planning, scheduling, controlling and measuring design and engineering activities is challenged nowadays not only by the strong competition, but also by the technology and the way projects are organized. The project organization challenges the planning process through its variety of people, organizations and cultures participating along the whole building project. Concurrent engineering is a building method dependent on a dynamic planning process that integrates and coordinates all the entities involved in the project. 3D modeling is a tool that necessitates more specialized engineers and a more collaborative way of engineering a project. It seems that today’s planning systems fail to take into consideration these challenges. This literature review is an attempt to find if and how the fields of project management and lean construction deal with planning and measuring design/engineering activities in a concurrent engineering process that is globally dispersed both on engineering and on production part of a project.

[1]  E. Larson,et al.  Project Management: The Managerial Process , 2002 .

[2]  Jack R. Meredith,et al.  Reconsidering the Philosophical Basis of OR/MS , 2001, Oper. Res..

[3]  Rafael Sacks,et al.  Measuring information flow in the detailed design of construction projects , 2010 .

[4]  Denise Bower,et al.  Design management: changing roles of the professions , 2007 .

[5]  John D. Fernandez,et al.  Agile Project Management —Agilism versus Traditional Approaches , 2008, J. Comput. Inf. Syst..

[6]  Bo Terje Kalsaas,et al.  INTEGRATION OF COLLABORATIVE LPS-INSPIRED AND RATIONALISTIC PLANNING PROCESSES IN MECHANICAL ENGINEERING OF OFFSHORE DRILLING CONSTRUCTIONS , 2013 .

[7]  Ken Schwaber Agile Project Management , 2005, XP.

[8]  Jan Ola Strandhagen,et al.  Supply chain management in the shipbuilding industry: challenges and perspectives , 2011 .

[9]  J. Söderlund,et al.  Business models in project business , 2010 .

[10]  Eduardo Rosas Integrating the Design Structure Matrix and the Last Planner System Into Building Design , 2013 .

[11]  J. O'Neill,et al.  Project management. , 2001, Health management technology.

[12]  Norbert Gronau,et al.  01 COLLABORATIVE ENGINEERING COMMUNITIES IN SHIPBUILDING , 2004 .

[13]  Philippe Kruchten,et al.  Agile project management , 2021, Project Management, Planning and Control.

[14]  Patricia Tzortzopoulos,et al.  Design process planning and control : last planner system adaptation , 2013 .

[15]  Peter W. G. Morris,et al.  The Wiley Guide to Managing Projects , 2004 .

[16]  Harold Kerzner,et al.  Project Management Metrics, KPIs, and Dashboards: A Guide to Measuring and Monitoring Project Performance , 2011 .

[17]  S. M. Kinsella Activity-Based Costing: Does it Warrant Inclusion in a Guide to the Project Management Body of Knowledge (PMBOK® Guide)? , 2002 .

[18]  Stephen Emmitt,et al.  DEVELOPING A CONCEPTUAL LEAN BRIEFING PROCESS MODEL FOR LEAN DESIGN MANAGEMENT , 2013 .

[19]  Jan Emblemsvåg,et al.  Lean Project Planning in Shipbuilding , 2014 .

[20]  Mike Kagioglou,et al.  Interactions between Transformations: Flow and Value at the Design Front-end for Primary Healthcare Facilities , 2005 .

[21]  James P. Lewis,et al.  Project Planning, Scheduling & Control: A Hands-On Guide to Bringing Projects in on Time and on Budget , 1991 .

[22]  Rafael Sacks,et al.  A Methodology for Assessment of the Impact of 3D Modeling of Buildings on Structural Engineering Productivity , 2005 .

[23]  B De Reyck Effective project planning: making the most of project planning tools. , 2010 .

[24]  Luis F. Alarcón,et al.  Understanding the Relationship Between Planning Reliability and Schedule Performance: A Case Study , 2009 .

[25]  Shin Ta Liu,et al.  Project Management: A Systems Approach To Planning, Scheduling and Controlling (Book) , 2004 .

[26]  Niels G. Noorderhaven,et al.  Learning to collaborate in multi-organizational projects , 2011 .

[27]  Jennifer A. Farris,et al.  A Multilevel Framework for Lean Product Development System Design , 2011 .

[28]  Pablo Orihuela,et al.  Tools for Design Management in Building Projects , 2011 .

[29]  Gregory A. Howell,et al.  An Update on Last Planner , 2003 .

[30]  James P. Lewis Project planning, scheduling & control : the ultimate hands-on guide to bringing projects in on time and on budget , 2011 .

[31]  Lauri Koskela,et al.  Towards Lean Design Management , 1997 .

[32]  Iris D. Tommelein,et al.  Is the Last Planner System Applicable to Design? A Case Study , 2009 .

[33]  Luis F. Alarcón,et al.  Achieving Lean Design Process: Improvement Methodology , 2002 .

[34]  Paul A. Tilley Lean Design Management: A New Paradigm for Managing the Design and Documentation Process to Improve Quality? , 2005 .

[35]  Lauri Koskela,et al.  In Time at Last - Adaption of Last Planner Tools for the Design Phase of a Building Project , 2012 .

[36]  Stephen P. Mulva,et al.  Benchmarking Project Level Engineering Productivity , 2012 .