The 8th flow - common understanding

Projects are a form of engineered-to-order (ETO) production which require that the definition of Value becomes part of the production process. Project production requires the inclusion of the product design, the design process, and the production process to be integrated in order to fully benefit from waste reduction and process improvement. In construction, project production is more challenging because of the temporal, transient, and fragmented nature of the project team and the supporting supply chain. This requires a form of ‘interoperability’ between the supply chain organisations, the particular teams involved, the commissioning clients and other stakeholders. It is proposed that this ‘interoperability’ is a form of common understanding and that this understanding needs to be defined, developed, and nurtured across the project execution as a flow in the same way that other flows are managed. Building on the seven flow model proposal reported by Koskela and Howell (1999), this paper proposes a common understanding as an eighth flow and suggests how it might be managed. The paper classifies the concept of common understanding as a soft flow and shows that although it is a fresh insight it actually has roots in lean production. The identity of common understanding as the eighth flow arises from a number of funded research projects in which the difficulties of lean construction implementation were investigated.

[1]  Frank George Woollard,et al.  Principles of Mass and Flow Production , 2009 .

[2]  Gregory A. Howell,et al.  An Optimised Project Requires Optimised Incentives , 2010 .

[3]  Lauri Koskela,et al.  Application of the New Production Philosophy to Construction , 1992 .

[4]  Mike Bresnen,et al.  Leader orientation and organizational transience: An investigation using Fiedler's LPC Scale. , 1987 .

[5]  Herman Glenn Ballard,et al.  THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .

[6]  大野 耐一,et al.  Toyota production system : beyond large-scale production , 1988 .

[7]  Jeffrey K. Liker,et al.  The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .

[8]  Mike Kagioglou,et al.  DEVELOPING PRODUCTION THEORY: WHAT ISSUES NEED TO BE TAKEN INTO CONSIDERATION? , 2012 .

[9]  Stephen Emmitt,et al.  Is good enough “making do”? An investigation of inappropriate processing in a small design and build company , 2012 .

[10]  Lauri Koskela,et al.  Reforming project management: The role of planning, execution and controlling , 2001 .

[11]  Christine Pasquire,et al.  Target value design: using collaboration and a lean approach to reduce construction cost , 2012 .

[12]  Gregory A. Howell,et al.  Toward construction JIT , 1997 .

[13]  Christine Pasquire,et al.  The growing case for lean construction , 2011 .

[14]  Frank G. Woollard,et al.  Some Notes on British Methods of Continuous Production , 1925 .

[15]  Aviad Shapira,et al.  Implementation of Pull Control in Finishing Works With Re-Entrant Flow , 2010 .

[16]  Taiichi Ohno,et al.  Toyota Production System : Beyond Large-Scale Production , 1988 .

[17]  Tariq S. Abdelhamid,et al.  Cue-based decision-making in construction: An agent-based modeling approach , 2012 .

[18]  M. L. Emiliani,et al.  Frank George Woollard: forgotten pioneer of flow production , 2011 .

[19]  Lauri Koskela,et al.  An exploration towards a production theory and its application to construction , 2000 .

[20]  Robert Grace Moving toward Construction , 2009 .

[21]  Jeffrey K. Liker,et al.  The Toyota Product Development System: Integrating People, Process And Technology , 2006 .

[22]  Ernie Appleton,et al.  Product Design for Manufacture and Assembly , 2008 .

[23]  Lauri Koskela Making-Do — the Eighth Category of Waste , 2004 .

[24]  Iris D. Tommelein,et al.  Root Causes of Clashes in Building Information Models , 2012 .