The 8th flow - common understanding
暂无分享,去创建一个
[1] Frank George Woollard,et al. Principles of Mass and Flow Production , 2009 .
[2] Gregory A. Howell,et al. An Optimised Project Requires Optimised Incentives , 2010 .
[3] Lauri Koskela,et al. Application of the New Production Philosophy to Construction , 1992 .
[4] Mike Bresnen,et al. Leader orientation and organizational transience: An investigation using Fiedler's LPC Scale. , 1987 .
[5] Herman Glenn Ballard,et al. THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .
[6] 大野 耐一,et al. Toyota production system : beyond large-scale production , 1988 .
[7] Jeffrey K. Liker,et al. The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .
[8] Mike Kagioglou,et al. DEVELOPING PRODUCTION THEORY: WHAT ISSUES NEED TO BE TAKEN INTO CONSIDERATION? , 2012 .
[9] Stephen Emmitt,et al. Is good enough “making do”? An investigation of inappropriate processing in a small design and build company , 2012 .
[10] Lauri Koskela,et al. Reforming project management: The role of planning, execution and controlling , 2001 .
[11] Christine Pasquire,et al. Target value design: using collaboration and a lean approach to reduce construction cost , 2012 .
[12] Gregory A. Howell,et al. Toward construction JIT , 1997 .
[13] Christine Pasquire,et al. The growing case for lean construction , 2011 .
[14] Frank G. Woollard,et al. Some Notes on British Methods of Continuous Production , 1925 .
[15] Aviad Shapira,et al. Implementation of Pull Control in Finishing Works With Re-Entrant Flow , 2010 .
[16] Taiichi Ohno,et al. Toyota Production System : Beyond Large-Scale Production , 1988 .
[17] Tariq S. Abdelhamid,et al. Cue-based decision-making in construction: An agent-based modeling approach , 2012 .
[18] M. L. Emiliani,et al. Frank George Woollard: forgotten pioneer of flow production , 2011 .
[19] Lauri Koskela,et al. An exploration towards a production theory and its application to construction , 2000 .
[20] Robert Grace. Moving toward Construction , 2009 .
[21] Jeffrey K. Liker,et al. The Toyota Product Development System: Integrating People, Process And Technology , 2006 .
[22] Ernie Appleton,et al. Product Design for Manufacture and Assembly , 2008 .
[23] Lauri Koskela. Making-Do — the Eighth Category of Waste , 2004 .
[24] Iris D. Tommelein,et al. Root Causes of Clashes in Building Information Models , 2012 .