A concise review of flexible manufacturing systems and FMS literature

Abstract The widespread popularity of Flexible Manufacturing Systems (FMS) has resulted in a prolific bibliography of literature describing several frameworks for analysis, planning and control of this automated mode of production. In this paper we review literature and discuss both the major characteristics of FMS and the contemporary decision support systems that have emerged to address the planning and control problems inherent in FMS.

[1]  Simon French,et al.  Multi-Objective Decision Analysis with Engineering and Business Applications , 1983 .

[2]  Hoda A. ElMaraghy Simulation and graphical animation of advanced manufacturing systems , 1982 .

[3]  Stephen F. Smith,et al.  ISIS : a constraint-directed reasoning approach to job shop scheduling, a system summary , 1983 .

[4]  Sten-Olof Gustavsson,et al.  Flexibility and productivity in complex production processes , 1984 .

[5]  William S. Gere Heuristics in Job Shop Scheduling , 1966 .

[6]  M. D. Byrne,et al.  A combined switching algorithm and linear decision rule approach to production planning , 1985 .

[7]  N. Dopuch,et al.  Management Goals and Accounting for Control. , 1967 .

[8]  John Mortimer The FMS report , 1984 .

[9]  Jr King Scheduling and the problem of computational complexity , 1979 .

[10]  P. J. O’Grady,et al.  Work Flow in Flexible Manufacturing Systems , 1984 .

[11]  Enrico Canuto,et al.  Analysis of Flexible Manufacturing Systems , 1983 .

[12]  Paul G. Ranky The design and operation of FMS , 1983 .

[13]  Veikko Jääskeläinen,et al.  A Goal Programming Model of Aggregate Production Planning , 1969 .

[14]  J. A. Buzacott,et al.  Models for Understanding Flexible Manufacturing Systems , 1980 .

[15]  Stanley B. Gershwin,et al.  Flow optimization in flexible manufacturing systems , 1985 .

[16]  Jsh Kornbluth,et al.  A survey of goal programming , 1973 .

[17]  N. Nilsson,et al.  FIGARMA - Fully integrated garment manufacture: An extension of the concept of flexible manufacturing systems , 1983 .

[18]  John R. King,et al.  Scheduling: Bibliography & Review , 1980 .

[19]  Jeffrey P. Buzen,et al.  Computational algorithms for closed queueing networks with exponential servers , 1973, Commun. ACM.

[20]  S. Eilon Five Approaches to Aggregate Production Planning , 1975 .

[21]  Frederick S. Hillier,et al.  Introduction of Operations Research , 1967 .

[22]  Dragutin M. Zelenović,et al.  Flexibility—a condition for effective production systems , 1982 .

[23]  C. Hwang Multiple Objective Decision Making - Methods and Applications: A State-of-the-Art Survey , 1979 .

[24]  Jules Farkas Some aspects of an integrated manufacturing system , 1979 .

[25]  Kathryn E. Stecke,et al.  Loading and control policies for a flexible manufacturing system , 1981 .

[26]  Catherine Dupont-Gatelmand A survey of flexible manufacturing systems , 1982 .

[27]  W. J. Gordon,et al.  Closed Queuing Systems with Exponential Servers , 1967, Oper. Res..

[28]  Stanley B. Gershwin,et al.  An algorithm for the computer control of a flexible manufacturing system , 1983 .

[29]  Arnoldo C. Hax,et al.  Hierarchical integration of production planning and scheduling , 1973 .

[30]  U. Menon,et al.  A MULTIPLE CRITERIA APPROACH FOR PRODUCTION PLANNING OF AUTOMATED MANUFACTURING , 1985 .

[31]  Kazuaki Iwata,et al.  Simulation for Design and Operation of Manufacturing Systems , 1984 .

[32]  W Thomas Lin,et al.  A survey of goal programming applications , 1980 .

[33]  Frank C. Harris,et al.  Truck Fleet Composition for Concrete Distribution , 1979 .

[34]  Kazuaki Iwata,et al.  Production Scheduling of Flexible Manufacturing Systems , 1982 .

[35]  Andrew Kusiak Part Families Selection Model For Flexible Manufacturing Systems. , 1983 .

[36]  Roger M. Y. Ho,et al.  Goal programming and extensions , 1976 .

[37]  Stanley B. Gershwin,et al.  Performance of hierarchical production scheduling policy , 1984 .

[38]  Mark S. Fox,et al.  Reasoning With Incomplete Knowledge in a Resource-Limited Environment: Integrating Reasoning and Knowledge Acquisition , 1981, IJCAI.

[39]  Gideon Halevi,et al.  On Line Scheduling for Flexible Manufacturing Systems , 1984 .

[40]  George K. Hutchinson The design of an automated material handling system for a job shop , 1983 .

[41]  Andrew B. Whinston,et al.  Control and Decision Support in Automatic Manufacturing Systems , 1980 .

[42]  John S. Wilkes,et al.  The techniques of production management , 1974 .

[43]  J. Mccartney,et al.  Tooling economics in integrated manufacturing systems , 1982 .

[44]  G. Seliger,et al.  Simultaneous Processing – Scheduling Concept for Flexible Manufacturing Systems , 1983 .

[45]  Simon French,et al.  Interactive Multi-Objective Programming: Its Aims, Applications and Demands , 1984 .

[46]  N. Slack Flexibility as a Manufacturing Objective , 1983 .

[47]  J M Wilson Formulation and Solution of a Set of Sequencing Problems for Flexible Manufacturing Systems , 1987 .

[48]  Robert W. Hahn,et al.  Technical Note - On Reconciling Conflicting Goals: Applications of Multiobjective Programming , 1981, Oper. Res..

[49]  J. McCartney,et al.  Interactive Scheduling Procedures for Flexible Manufacturing Systems , 1982 .

[50]  Kuji Ijiri,et al.  GOAL ORIENTED MODELS FOR ACCOUNTING AND CONTROL , 1963 .

[51]  James P. Ignizio,et al.  A Review of Goal Programming: A Tool for Multiobjective Analysis , 1978 .

[52]  W. E. Wilhelm,et al.  Effectiveness of alternate operations in a flexible manufacturing system , 1985 .

[53]  Moshe M. Barash,et al.  Operational control of item flow in versatile manufacturing systems , 1979 .

[54]  S. S. Panwalkar,et al.  A Survey of Scheduling Rules , 1977, Oper. Res..

[55]  Peter O'Grady,et al.  A general search sequencing rule for job shop sequencing , 1985 .

[56]  Samuel Eilon,et al.  A new approach to production smoothing , 1974 .

[57]  John Hartley,et al.  Fms at Work , 1984 .

[58]  William W. Cooper,et al.  Goal programming and constrained regression—A comment , 1975 .

[59]  James J. Solberg,et al.  Operations Research: Principles and Practice. , 1977 .

[60]  Bradley P. Allen,et al.  Job-Shop Scheduling: An Investigation in Constraint-Directed Reasoning , 1982, AAAI.

[61]  M. Zeleny Linear Multiobjective Programming , 1974 .

[62]  Kathryn E. Stecke,et al.  Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems , 1983 .

[63]  David L. Olson Comparison of Four Goal Programming Algorithms , 1984 .

[64]  Sang M. Lee,et al.  Goal programming for decision analysis , 1972 .

[65]  R. P. Mohanty,et al.  An Assessment of Some Approaches to Hierarchical Production Planning , 1984 .

[66]  E. Adhami,et al.  Introducing a flexible manufacturing system , 1984 .

[67]  Shigenobu Kobayashi,et al.  An interactive system for supporting multiobjective decision making , 1983, Autom..

[68]  James S. Albus,et al.  The automated manufacturing research facility of the national bureau of standards , 1984 .

[69]  C. Harrison,et al.  Hierarchical production planning and control , 1985 .

[70]  S. Eilon Goals and Constraints in Decision-making† , 1972 .

[71]  P. Hansen,et al.  Essays and surveys on multiple criteria decision making : proceedings of the Fifth International Conference on Multiple Criteria Decision Making, Mons, Belgium, August 9-13, 1982 , 1983 .

[72]  Elwood Spencer Buffa,et al.  Mathematical programming : an introduction to the design and application of optimal decision machines , 1970 .

[73]  S. Gershwin,et al.  Network flow optimization in flexible manufacturing systems , 1978, 1978 IEEE Conference on Decision and Control including the 17th Symposium on Adaptive Processes.