Evaluation of facility layout alternatives for a remanufacturing environment
暂无分享,去创建一个
[1] R. Uzsoy,et al. Production planning for companies with product recovery and remanufacturing capability , 1997, Proceedings of the 1997 IEEE International Symposium on Electronics and the Environment. ISEE-1997.
[2] Rajesh Srivastava,et al. Product structure complexity and scheduling of operations in recoverable manufacturing , 1997 .
[3] Benoit Montreuil. Fractal layout organization for job shop environments , 1999 .
[4] Vaidyanathan Jayaraman,et al. The effect of lead time variation on the performance of disassembly release mechanisms , 1999 .
[5] Shad Dowlatshahi,et al. Developing a Theory of Reverse Logistics , 2000, Interfaces.
[6] Surendra M. Gupta,et al. Disassembly sequence planning for products with defective parts in product recovery , 1998 .
[7] J. Hesselbach,et al. Disassembly simulation for an effective recycling of electrical scrap , 1999, Proceedings First International Symposium on Environmentally Conscious Design and Inverse Manufacturing.
[8] E. A. van deLaan,et al. Production planning and inventory control with remanufacturing and disposal , 1997 .
[9] V. Daniel R. Guide,et al. An evaluation of order release strategies in a remanufacturing environment , 1997, Comput. Oper. Res..
[10] Frank W. Ciarallo,et al. An empirical evaluation of holonic and fractal layouts , 1999 .
[11] Rajesh Srivastava,et al. Inventory buffers in recoverable manufacturing , 1998 .
[12] Rommert Dekker,et al. Inventory Control in Hybrid Systems with Remanufacturing , 1999 .