Large Scale Hydro-Thermal Unit Commitment-Method and Results
暂无分享,去创建一个
[1] L. L. Garver,et al. Power Generation Scheduling by Integer Programming-Development of Theory , 1962, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.
[2] F. H. Light,et al. Application of Digital Computer Techniques to the Economic Scheduling of Marginal Generating Units for the Pennsylvania-New Jersey-Maryland Interconnection , 1964 .
[3] E. D. Farmer,et al. Development of online load-prediction techniques with results from trials in the south-west region of the CEGB , 1968 .
[4] T. P. Benthall. Automatic load scheduling in a multiarea power system , 1968 .
[5] R. H. Kerr,et al. Unit commitment , 1966, Mathematical Programming for Power Systems Operation with Applications in Python.
[6] L. T. Anstine,et al. Application of Probability Methods to the Determination of Spinning Reserve Requirements for the Pennsylvania-New Jersey-Maryland Interconnection , 1963 .
[7] K. M. Dale,et al. A Study of the Economic Shutdown of Generating Units in Daily Dispatch , 1959, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.
[8] P. Pettit,et al. Digital-computer programs for an experimental automatic load-dispatching system , 1968 .
[9] K. M. Dale,et al. Dynamic-programming approach to the selection and timing of generation-plant additions , 1966 .
[10] D. W. Wells,et al. Method for economic secure loading of a power system , 1968 .