Discrete-time, economic lot scheduling problem on multiple, non-identical production lines

This paper deals with a general discrete time dynamic demand model to solve real time resource allocation and lot-sizing problems in a multimachine environment. In particular, the problem of apportioning item production to distinct manufacturing lines with different costs (production, setup and inventory) and capabilities is considered. Three models with different cost definitions are introduced, and a set of algorithms able to handle all the problems are developed. The computational results show that the best of the developed approaches is able to handle problems with up to 10000 binary variables outperforming general-purpose solvers and other randomized approaches. The gap between lower and upper bound procedures is within 1.0% after about 500 seconds of CPU time on a 2.66Â Ghz Intel Core2 PC.

[1]  Guillermo Gallego Reduced production rates in the economic lot scheduling problem , 1993 .

[2]  Ramesh Bollapragada,et al.  Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines , 1999 .

[3]  Steven Nahmias,et al.  Production and operations analysis , 1992 .

[4]  Antonio Bolufé Röhler,et al.  Matheuristics: Optimization, Simulation and Control , 2009, Hybrid Metaheuristics.

[5]  Alf Kimms,et al.  Lot sizing and scheduling -- Survey and extensions , 1997 .

[6]  Chris N. Potts,et al.  Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity , 1992 .

[7]  Roberto Tadei,et al.  Recovering Beam Search: Enhancing the Beam Search Approach for Combinatorial Optimization Problems , 2004, J. Heuristics.

[8]  W. Hsu On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine , 1983 .

[9]  Heinrich Kuhn,et al.  Capacitated lot-sizing with extensions: a review , 2008, 4OR.

[10]  José Juan Carreño Economic Lot Scheduling for Multiple Products on Parallel Identical Processors , 1990 .

[11]  Walter Ukovich,et al.  Economic lot scheduling on multiple production lines with resource constraints , 2003 .

[12]  Michael Pinedo,et al.  Planning and Scheduling in Manufacturing and Services , 2008 .

[13]  Paul H. Zipkin,et al.  Foundations of Inventory Management , 2000 .

[14]  Ilkyeong Moon,et al.  The Effect of Externalizing Setups in the Economic Lot Scheduling Problem , 1992, Oper. Res..

[15]  Michael Pinedo,et al.  Scheduling: Theory, Algorithms, and Systems , 1994 .

[16]  W. L. Maxwell,et al.  Scheduling Cyclic Production on Several Identical Machines , 1986, Oper. Res..

[17]  P. C. Jones,et al.  When Is The Economic Lot Scheduling Problem Easy , 1989 .

[18]  S. Elmaghraby The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .

[19]  Paul H. Zipkin Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem , 1991, Oper. Res..

[20]  Gregory Dobson,et al.  The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes , 1987, Oper. Res..