Three-dimensional model of customer order decoupling point position in mass customisation

Traditionally the customer order decoupling point (CODP) has focused mainly on the engineering and production activities, defined a CODP for an enterprise (or supply chain) based on the integration of these two activities. As customer requirements for short lead-times in combination with customisations increase, uniform CODP for all products of enterprise (or supply chain) makes the traditional view of the CODP insufficient in these cases. The purpose of this paper is thus to provide a more general approach to define several CODP as a three-dimensional concept based on the integration of product, engineering and production activities. The extended CODP captures the complexity in terms of possible configurations, increases the flexibility of the manufacturing system, but also provides a framework for the issues that must be handled when positioning the CODPs in terms of products, engineering and production activities simultaneously. The three-dimensional CODP is an important extension to make the theory better reflecting reality and hence increase the scope and acceptance of both the concept CODP per se, and the analysis based on the CODP. We also provide a classification of products based on a combined engineering and production perspective where the efficient CODPs constitute a set providing the highest level of customer value and the minimum delivery lead time.

[1]  George L. Nemhauser,et al.  Handbooks in operations research and management science , 1989 .

[2]  J. Wikner,et al.  Introducing a customer order decoupling zone in logistics decision-making , 2005 .

[3]  Julian Coleman Linking manufacturing strategy to the design of hybrid production control systems , 1994 .

[4]  N. D. Burns,et al.  Implications of postponement for the supply chain , 2003 .

[5]  L. P. Bucklin Postponement, Speculation and the Structure of Distribution Channels , 1965 .

[6]  Chen Jun-fang Mass Customization in terms of the Customer Order Decoupling Point , 2008 .

[7]  新郷 重夫,et al.  A study of the Toyota production system from an industrial engineering viewpoint , 1989 .

[8]  Hal Mather How to Profitably Delight Your Customers , 1998 .

[9]  Jeffrey D. Camm,et al.  Coping with the build-to-forecast environment , 1990 .

[10]  G. Stalk Time-The Next Source of Competitive Advantage , 1988 .

[11]  William L. Berry,et al.  Linking Systems to Strategy , 1992 .

[12]  V. Donk Make to stock or make to order: the decoupling point in the food processing industries , 2001 .

[13]  Jayashankar M. Swaminathan,et al.  Managing broader product lines through delayed differentiation using vanilla boxes , 1998 .

[14]  Hartmut Stadtler,et al.  Supply Chain Management and Advanced Planning: Concepts, Models, Software, and Case Studies , 2010 .

[15]  Urban Wemmerlöv,et al.  Assemble-to-order manufacturing: Implications for materials management , 1984 .

[16]  Denis Royston Towill,et al.  Using the Information Decoupling Point to Improve Supply Chain Performance , 1999 .

[17]  William L. Berry,et al.  Customer‐driven manufacturing , 1995 .

[18]  Jan Olhager,et al.  Strategic positioning of the order penetration point , 2003 .

[19]  F. S. Fogliatto,et al.  Flexibility-driven index for measuring mass customization feasibility on industrialized products , 2003 .

[20]  Jan Olhager,et al.  Long-term capacity management: Linking the perspectives from manufacturing strategy and sales and operations planning , 2001 .

[21]  Paul Higgins,et al.  Manufacturing Planning and Control: Beyond MRP II , 1996 .

[22]  S. Hoekstra,et al.  Integral Logistic Structures: Developing Customer-Oriented Goods Flow , 1992 .

[23]  Terry Hill,et al.  Manufacturing Strategy: Text and Cases , 1993 .

[24]  Pmj Paul Giesberts,et al.  Dynamics of the customer order decoupling point: impact on information systems for production control , 1992 .

[25]  Jan Olhager,et al.  An integrated push-pull manufacturing strategy , 1990 .

[26]  Jimmie Browne,et al.  Production Management Systems: An Integrated Perspective , 1996 .

[27]  A. K. Bhattacharya,et al.  Linking manufacturing strategy to the design of a customized hybrid production control system , 1994 .

[28]  Michael J. Magazine,et al.  A NUMERICAL ANALYSIS OF CAPACITATED POSTPONEMENT , 2009 .

[29]  Xiao-Feng Shao,et al.  Evaluation of postponement strategies in mass customization with service guarantees , 2008 .

[30]  Danny Berry,et al.  Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain , 1999 .