Digital twin-based production scheduling system for heavy truck frame shop
暂无分享,去创建一个
[1] Bing-hai Zhou,et al. A multiobjective hybrid imperialist competitive algorithm for multirobot cooperative assembly line balancing problems with energy awareness , 2018, Proceedings of the Institution of Mechanical Engineers, Part C: Journal of Mechanical Engineering Science.
[2] Vera Hummel,et al. Digital Twin as Enabler for an Innovative Digital Shopfloor Management System in the ESB Logistics Learning Factory at Reutlingen - University , 2017 .
[3] Sonna Kristina,et al. Proposed algorithm to improve job shop production scheduling using ant colony optimization method , 2017 .
[4] Lei Ren,et al. An event-triggered dynamic scheduling method for randomly arriving tasks in cloud manufacturing , 2017, Int. J. Comput. Integr. Manuf..
[5] Rifat Gürcan Özdemir. Fuzzy goal programming approach to multi-objective mixed model assembly line balancing , 2013 .
[6] Meng Zhang,et al. Digital Twin Shop-Floor: A New Shop-Floor Paradigm Towards Smart Manufacturing , 2017, IEEE Access.
[7] Chao Lu,et al. A hybrid multi-objective grey wolf optimizer for dynamic scheduling in a real-world welding industry , 2017, Eng. Appl. Artif. Intell..
[8] Masoud Rabbani,et al. A new multi-objective approach in order to balancing and sequencing U-shaped mixed model assembly line problem: a proposed heuristic algorithm , 2015 .
[9] Binghai Zhou,et al. Scheduling just-in-time part replenishment of the automobile assembly line with unrelated parallel machines , 2019, Proceedings of the Institution of Mechanical Engineers, Part C: Journal of Mechanical Engineering Science.
[10] R. Marian,et al. An improved genetic algorithm for multidimensional optimization of precedence-constrained production planning and scheduling , 2017 .
[11] Reza Tavakkoli-Moghaddam,et al. A multi-objective scatter search for a mixed-model assembly line sequencing problem , 2007, Adv. Eng. Informatics.
[12] Orhan Engin,et al. Using ant colony optimization to solve hybrid flow shop scheduling problems , 2007 .
[13] Yi Mei,et al. Genetic programming for production scheduling: a survey with a unified framework , 2017, Complex & Intelligent Systems.
[14] Hui Sun,et al. Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives , 2006 .
[15] Mingyong Liu,et al. An improved hierarchical genetic algorithm for collaborative optimization of manufacturing processes in metal structure manufacturing systems , 2017 .