More on three-machine no-idle flow shops
暂无分享,去创建一个
[1] Alain Guinet,et al. A travelling salesman approach to solve the F , 2005, Eur. J. Oper. Res..
[2] D. Pohoryles,et al. Flowshop/no-idle or no-wait scheduling to minimize the sum of completion times , 1982 .
[3] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[4] Alain Guinet,et al. Three stage no-idle flow-shops , 2003 .
[5] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[6] S. Elmaghraby,et al. The Analysis of Activity Networks Under Generalized Precedence Relations GPRs , 1992 .
[7] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[8] Chelliah Sriskandarajah,et al. A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..