Optimization of a Revetment Engineering Construction Scheme in Taishan

This paper introduces the reason for a revetment engineering optimization scheme in Taishan and the forming process,makes contrast analysis on the construction process,work amount and ship input before and after the optimized construction scheme,the verification results show that the construction quality meets the design requirements;the construction is convenient,and the economy is reasonable after optimization.