Improvement of Labour Utilisation in Shift Scheduling for Services with Implicit Optimal Modelling
暂无分享,去创建一个
[1] Kenneth R. Baker,et al. Workforce Allocation in Cyclical Scheduling Problems: A Survey , 1976 .
[2] John J. Bartholdi,et al. A Guaranteed-Accuracy Round-off Algorithm for Cyclic Scheduling and Set Covering , 1981, Oper. Res..
[3] John Field,et al. Personnel scheduling with flexshift models , 1985 .
[4] Vincent A. Mabert,et al. An Evaluation of a Full‐/Part‐time Tour Scheduling Methodology , 1988 .
[5] James M. Tien,et al. On Manpower Scheduling Algorithms , 1982 .
[6] Leon F. McGinnis,et al. One- and two-phase heuristics for workforce scheduling , 1978 .
[7] H. D. Ratliff,et al. Unnetworks, with Applications to Idle Time Scheduling , 1978 .
[8] George B. Dantzig,et al. Letter to the Editor - A Comment on Edie's "Traffic Delays at Toll Booths" , 1954, Oper. Res..
[9] M. Segal,et al. The Operator-Scheduling Problem: A Network-Flow Approach , 1974, Oper. Res..
[10] Stephen E. Bechtold,et al. Implicit modeling of flexible break assignments in optimal shift scheduling , 1990 .
[11] J. L. Byrne,et al. Scheduling of Toll Collectors , 1973 .
[12] William L. Berry,et al. Heuristic Methods for Telephone Operator Shift Scheduling: An Experimental Analysis , 1976 .
[13] V. Mabert,et al. A Simulation Analysis of Tour-Shift Construction Procedures , 1982 .