CARIMO - A heuristic approach to machine-part cell formation

[1]  P. Waghodekar,et al.  Machine-component cell formation in group technology: MACE , 1984 .

[2]  Milos Danilovic,et al.  A novel hybrid algorithm for manufacturing cell formation problem , 2019, Expert Syst. Appl..

[3]  Y. Won,et al.  Multiple criteria clustering algorithm for solving the group technology problem with multiple process routings , 1997 .

[4]  Hamid Seifoddini,et al.  A note on the similarity coefficient method and the problem of improper machine assignment in group technology applications , 1989 .

[5]  Mohammad Mahdi Paydar,et al.  A hybrid genetic algorithm for dynamic virtual cellular manufacturing with supplier selection , 2017 .

[6]  Ronald G. Asktn,et al.  A cost-based heuristic for group technology configuration† , 1987 .

[7]  Maged Dessouky,et al.  A Heuristic-Based Procedure for the Weighted Production-Cell Formation Problem , 1996 .

[8]  Warren J. Boe,et al.  A close neighbour algorithm for designing cellular manufacturing systems , 1991 .

[9]  Vikram Sharma,et al.  Implementation model for cellular manufacturing system using AHP and ANP approach , 2019, Benchmarking: An International Journal.

[10]  I.G.K. Ei-Essawy,et al.  Component flow analysis - an effective approach to production systems' design , 1972 .

[11]  Christos Dimopoulos,et al.  A hierarchical clustering methodology based on genetic programming for the solution of simple cell-formation problems , 2001 .

[12]  Chandrasekharan Rajendran,et al.  An ant colony algorithm for cell-formation in cellular manufacturing systems , 2008 .

[13]  R. Sudhakara Pandian,et al.  A simulated annealing for the cell formation problem with ratio level data , 2019 .

[14]  Oliver Schütze,et al.  Metaheuristics to solve grouping problems: A review and a case study , 2020, Swarm Evol. Comput..

[15]  J. F. Ferreira Ribeiro,et al.  A methodology for cellular manufacturing design , 1993 .

[16]  M. Chandrasekharan,et al.  ZODIAC—an algorithm for concurrent formation of part-families and machine-cells , 1987 .

[17]  D. A. Milner,et al.  Direct clustering algorithm for group formation in cellular manufacture , 1982 .

[18]  Nancy Lea Hyer,et al.  Group technology in the US manufacturing industry: A survey of current practices , 1989 .

[19]  T. Narendran,et al.  An assignment model for the part-families problem in group technology , 1990 .

[20]  Dimitris Mourtzis,et al.  A Framework for Adaptive Scheduling in Cellular Manufacturing Systems , 2020 .

[21]  Mauricio G. C. Resende,et al.  An evolutionary algorithm for manufacturing cell formation , 2004, Comput. Ind. Eng..

[22]  John McAuley,et al.  Machine grouping for efficient production , 1972 .

[23]  Anjali Awasthi,et al.  A novel approach to determine the cell formation using heuristics approach , 2019 .

[24]  G. Srinivasan,et al.  GRAFICS—a nonhierarchical clustering algorithm for group technology , 1991 .

[25]  Panos M. Pardalos,et al.  Exact model for the cell formation problem , 2014, Optim. Lett..

[26]  Y. Won Two-phase approach to GT cell formation using efficient p-median formulations , 2000 .

[27]  A. G. Burgess,et al.  Cellular manufacturing: its impact on the total factory , 1993 .

[28]  V. Selladurai,et al.  Optimization and implementation of cellular manufacturing system in a pump industry using three cell formation algorithms , 2007 .

[29]  Larry E. Stanfel,et al.  Machine clustering for economic production , 1985 .

[30]  Larry R. Taube,et al.  The facets of group technology and their impacts on implementation--A state-of-the-art survey , 1985 .

[31]  Andrew Kusiak,et al.  Grouping of parts and components in flexible manufacturing systems , 1986 .

[32]  M. Chandrasekharan,et al.  GROUPABIL1TY: an analysis of the properties of binary data matrices for group technology , 1989 .

[33]  Hamid Seifoddini,et al.  Single linkage versus average linkage clustering in machine cells formation applications , 1989 .

[34]  Jacques A. Ferland,et al.  An exact method for solving the manufacturing cell formation problem , 2012 .

[35]  Harold J. Steudel,et al.  A within-cell utilization based heuristic for designing cellular manufacturing systems , 1987 .

[36]  J. C. Wei,et al.  A capacity constrained multiobjective cell formation method , 1990 .

[37]  Tarun Gupta,et al.  Production data based similarity coefficient for machine-component grouping decisions in the design of a cellular manufacturing system , 1990 .

[38]  R. Rajagopalan,et al.  Design of cellular production systems A graph-theoretic approach , 1975 .

[39]  Philip M. Wolfe,et al.  Application of the Similarity Coefficient Method in Group Technology , 1986 .

[40]  T. T. Narendran,et al.  Cluster goodness: A new measure of performance for cluster formation in the design of cellular manufacturing systems , 1997 .

[41]  J. King Machine-component grouping in production flow analysis: an approach using a rank order clustering algorithm , 1980 .

[42]  M. Chandrasekharan,et al.  Grouping efficacy: a quantitative criterion for goodness of block diagonal forms of binary matrices in group technology , 1990 .

[43]  M. Chandrasekharan,et al.  MODROC: an extension of rank order clustering for group technology , 1986 .

[44]  Tribikram Pradhan,et al.  Implementation of Machine Part Cell Formation Algorithm in Cellular Manufacturing Technology Using Neural Networks , 2015 .

[45]  Mehdi Hosseinabadi Farahani,et al.  An Ant Colony Optimization Approach for the Machine-Part Cell Formation Problem , 2011, Int. J. Comput. Intell. Syst..

[46]  Kam-Fai Wong,et al.  A TSP-based heuristic for forming machine groups and part families , 1998 .

[47]  A. Kusiak,et al.  Efficient solving of the group technology problem , 1987 .

[48]  A. Kusiak,et al.  Similarity coefficient algorithms for solving the group technology problem , 1992 .

[49]  Irina Utkina,et al.  A Branch and Bound Algorithm for a Fractional 0-1 Programming Problem , 2016, DOOR.

[50]  Larry R. Taube,et al.  Weighted similarity measure heuristics for the group technology machine clustering problem , 1985 .

[51]  Allan S. Carrie,et al.  Numerical taxonomy applied to group technology and plant layout , 1973 .

[52]  N. Gupta,et al.  Some clarifications on the use of Mahalanobis distance for the machine-part cell formation problem , 2014 .

[53]  N. Gupta,et al.  CARI – a heuristic approach to machine-part cell formation using correlation analysis and relevance index , 2014 .

[54]  Michael Mutingi,et al.  A genetic algorithm approach to cellular manufacturing systems , 2001 .

[55]  Mohamed Ismail,et al.  A Novel Modeling Approach for Solving the Cell Formation Problem , 2018 .

[56]  Berna Haktanirlar Ulutas,et al.  An immune system based algorithm for cell formation problem , 2019, J. Intell. Manuf..

[57]  Anthony Vannelli,et al.  Strategic subcontracting for efficient disaggregated manufacturing , 1986 .

[58]  Irina Utkina,et al.  A branch-and-bound algorithm for the cell formation problem , 2018, Int. J. Prod. Res..

[59]  Paul J. Schweitzer,et al.  Problem Decomposition and Data Reorganization by a Clustering Technique , 1972, Oper. Res..

[60]  Kyung Hyun Choi,et al.  A cost-based algorithm for design of Cellular Manufacturing Systems , 1998 .

[61]  Ronald G. Askin,et al.  A Hamiltonian path approach to reordering the part-machine matrix for cellular manufacturing , 1991 .

[62]  Philip M. Wolfe,et al.  Selection of a Threshold Value Based on Material Handling Cost in Machine-Component Grouping , 1987 .

[63]  Adnan Mukattash,et al.  Critical analysis of modified grouping efficacy measure; new weighted modified grouping efficiency measure , 2018 .

[64]  M. Brusco An exact algorithm for maximizing grouping efficacy in part–machine clustering , 2015 .

[65]  Mikhail Batsyn,et al.  An efficient exact model for the cell formation problem with a variable number of production cells , 2017, Comput. Oper. Res..

[66]  M. Chandrasekharan,et al.  An ideal seed non-hierarchical clustering algorithm for cellular manufacturing , 1986 .

[67]  G. Srinivasan A clustering algorithm for machine cell formation in group technology using minimum spanning trees , 1994 .

[68]  K. Currie,et al.  Fuzzy ART/RRR-RSS: a two-phase neural network algorithm for part-machine grouping in cellular manufacturing , 2007 .

[69]  F. Boctor A Jinear formulation of the machine-part cell formation problem , 1991 .

[70]  J. King,et al.  Machine-component group formation in group technology: review and extension , 1982 .