Optimal integrated maintenance/production policy for randomly failing systems with variable failure rate

This article deals with the combined production and maintenance plans for a manufacturing system satisfying a random demand. We first establish an optimal production plan which minimises the average total inventory and production cost. Second, using this optimal production plan, and taking into account the deterioration of the machine according to its production rate, we derive an optimal maintenance schedule which minimises the maintenance cost. A numerical example illustrates the proposed approach, this analytical approach, based on a stochastic optimisation model and using the operational age concept, reveals the significant influence of the production rate on the deterioration of the manufacturing system and consequently on the integrated production/maintenance policy.

[1]  Nidhal Rezg,et al.  Preventive maintenance of manufacturing systems under environmental constraints , 2007 .

[2]  Sebastian Martorell,et al.  Age-dependent reliability model considering effects of maintenance and working conditions , 1999 .

[3]  R. Akella,et al.  Optimal control of production rate in a failure prone manufacturing system , 1985, 1985 24th IEEE Conference on Decision and Control.

[4]  M.J. Roemer,et al.  Prognostic enhancements to gas turbine diagnostic systems , 2003, 2003 IEEE Aerospace Conference Proceedings (Cat. No.03TH8652).

[5]  A. K. S. Jardine,et al.  Maintenance, Replacement, and Reliability , 2021 .

[6]  Ram Akella,et al.  Optimal control of production rate in a failure prone manufacturing system , 1985 .

[7]  El-Kébir Boukas,et al.  Manufacturing flow control and preventing maintenance: a stochastic control approach , 1988 .

[8]  N. Rezg,et al.  Periodic and sequential preventive maintenance policies over a finite planning horizon with a dynamic failure law , 2011, J. Intell. Manuf..

[9]  Francesca Rossi,et al.  Constraint satisfaction techniques in planning and scheduling , 2010, J. Intell. Manuf..

[10]  Masaaki Kijima,et al.  Periodical replacement problem without assuming minimal repair , 1988 .

[11]  F. A. van der Duyn Schouten,et al.  Maintenance optimization of a production system with buffer capacity , 1995 .

[12]  Nidhal Rezg,et al.  Joint optimal inventory control and preventive maintenance policy , 2008 .

[13]  T. Nakagawa Periodic and sequential preventive maintenance policies , 1986 .

[14]  Nidhal Rezg,et al.  Joint optimization of preventive maintenance and inventory control in a production line using simulation , 2004 .

[15]  S. Özekici Optimal maintenance policies in random environments , 1995 .

[16]  El-Kébir Boukas,et al.  Optimal control of manufacturing flow and preventive maintenance , 1996 .

[17]  D.,et al.  Regression Models and Life-Tables , 2022 .

[18]  Oscar Salviano Silva Filho,et al.  An Optimal Production Policy Applied to a Flow-shop Manufacturing System , 2004 .

[19]  Ki Ling Cheung,et al.  Joint determination of preventive maintenance and safety stocks in an unreliable production environment , 1997 .