Leveling Process of Annual Budgetary Requirements for Pavement Preservation

AbstractThis paper presents a model for leveling annual budgetary requirements (ABRs) for pavement preservation programs over a multiyear analysis period. Given the information such as the candidate pavement preservation projects, associated costs, application years, and time floats to be shifted, the presented leveling process adjusts the application years of the projects to minimize the variance among ABRs. The minimum moment method is modified considering the dummy period that is to shift preservation projects within their time floats and additional constraints for the leveling process. To validate the leveling model, this study uses Indiana Department of Transportation (INDOT) pavement preservation projects as a case study that consists of a total of 193 projects over a three-year analysis period between 2010 and 2012. As a result of the case study, the leveling process provides relatively consistent ABRs over the three-year analysis period for INDOT. Therefore, the major contributions of this researc...

[1]  D. Savin,et al.  A procedure for calculating the weight-matrix of a neural network for resource leveling , 1997 .

[2]  Tarek Hegazy,et al.  Optimization of Resource Allocation and Leveling Using Genetic Algorithms , 1999 .

[3]  Sou-Sen Leu,et al.  RESOURCE LEVELING IN CONSTRUCTION BY GENETIC ALGORITHM-BASED OPTIMIZATION AND ITS DECISION SUPPORT SYSTEM APPLICATION , 2000 .

[4]  Bruce M. Woodworth,et al.  A HEURISTIC ALGORITHM FOR RESOURCE LEVELING IN MULTI-PROJECT, MULTI-RESOURCE SCHEDULING , 1975 .

[5]  Said M. Easa,et al.  Resource Leveling in Construction by Optimization , 1989 .

[6]  Julio C. Martinez,et al.  Resource Leveling Based on the Modified Minimum Moment Heuristic , 1993 .

[7]  Mohammed A. Salem Hiyassat,et al.  Applying Modified Minimum Moment Method to Multiple Resource Leveling , 2001 .

[8]  Robert B. Harris Packing Method for Resource Leveling (PACK) , 1990 .

[9]  Nabil A. Kartam,et al.  An artificial neural network for resource leveling problems , 1998, Artificial Intelligence for Engineering Design, Analysis and Manufacturing.

[10]  Masanori Takamoto,et al.  Zero-one quadratic programming algorithm for resource leveling of manufacturing process schedules , 1995, Systems and Computers in Japan.

[11]  Robert Blynn Harris,et al.  Precedence and Arrow Networking Techniques for Construction , 1980 .

[12]  Maged Georgy,et al.  Evolutionary resource scheduler for linear projects , 2008 .

[13]  Georgios Ellinas,et al.  Minimum Moment Method for Resource Leveling Using Entropy Maximization , 2010 .