Risk analysis associated to lightning in oil refinery construction sites
暂无分享,去创建一个
M. Shigihara | H. E. Sueta | J.A.B. Grimoni | G. F. Burani | W. J. D. Nascimento | J. Grimoni | M. Shigihara | G. Burani | H. E. Sueta | W. J. D. Nascimento
[1] L. Nagel,et al. SPICE (Simulation Program with Integrated Circuit Emphasis) , 1973 .
[2] José Aquiles Baesso Grimoni,et al. Development of a risk analysis computer program according to the IEC 62305-2 , 2009 .
[3] C. Christopoulos,et al. Modeling of a ground wire using TLM , 2008, 2008 IEEE/PES Transmission and Distribution Conference and Exposition.
[4] Mat Darveniza,et al. Tower Surge Impedance , 1969 .
[5] C. Christopoulos,et al. The Transmission-line Modeling Method: TLM , 1995, IEEE Antennas and Propagation Magazine.