Indicators for Interactive Scheduling

In the present study, we suggest an approach of interactive scheduling based on the definition of various types of indicators. The purpose of these indicators is to help a workshop manager to assess the performance of a schedule but also to identify the best way for improving it.

[1]  Lamia Berrah,et al.  Global vision and performance indicators for an industrial improvement approach , 2000 .

[2]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[3]  P. Aravindan,et al.  Constructive and improvement flow shop scheduling heuristics: An extensive evaluation , 2001 .

[4]  Pierre Lopez,et al.  Cooperative system design in scheduling , 1998 .

[5]  Sam Kwong,et al.  Genetic algorithm to production planning and scheduling problems for manufacturing systems , 2000 .

[6]  Bernard Grabot An implementation of man-software cooperative scheduling: The IO software , 1999 .

[7]  Stephen F. Smith,et al.  Knowledge-based production management approaches, results and prospects , 1992 .

[8]  Herbert A. Simon,et al.  The new science of management decision , 1960 .

[9]  Stephen F. Smith,et al.  Viewing scheduling as an opportunistic problem-solving process , 1988 .

[10]  F. Farhoodi A knowledge-based approach to dynamic job-shop scheduling , 1990 .

[11]  N. Metropolis,et al.  Equation of State Calculations by Fast Computing Machines , 1953, Resonance.

[12]  E. Bensana,et al.  OPAL: A Knowledge-Based System for Industrial Job-Shop Scheduling , 1988 .

[13]  Dong H. Baek,et al.  A visualized human-computer interactive approach to job shop scheduling , 1999, Int. J. Comput. Integr. Manuf..

[14]  A. Hertz,et al.  An expert system prototype for the selection of scheduling methods , 1997, 1997 IEEE 6th International Conference on Emerging Technologies and Factory Automation Proceedings, EFTA '97.

[15]  H. Pierreval,et al.  Dynamic scheduling selection of dispatching rules for manufacturing system , 1997 .

[16]  Bernard Grabot Objective satisfaction assessment using neural nets for balancing multiple objectives , 1998 .

[17]  Abdelhakim Artiba,et al.  An architecture of a multi-model system for planning and scheduling , 1997 .

[18]  N. Jawahar,et al.  A simulated annealing algorithm for job shop scheduling , 1999 .

[19]  Fred Glover,et al.  Tabu Search - Part II , 1989, INFORMS J. Comput..

[20]  Yoke San Wong,et al.  Dynamic selection of dispatching rules for job shop scheduling , 2000 .