Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization
暂无分享,去创建一个
[1] Bassem Jarboui,et al. A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems , 2008, Appl. Math. Comput..
[2] Mario Vanhoucke,et al. An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances , 2014, Eur. J. Oper. Res..
[3] Rainer Kolisch,et al. Scheduling and staffing multiple projects with a multi-skilled workforce , 2010, OR Spectr..
[4] Rainer Kolisch,et al. PSPLIB - A project scheduling problem library: OR Software - ORSEP Operations Research Software Exchange Program , 1997 .
[5] Lv Xuezhi. Project scheduling problem constrained by flexible resource with capability difference , 2012 .
[6] Zhou Hong. Multi-project Scheduling Problem with Human Resources Based on Genetic Algorithm and Column Generation , 2010 .
[7] Deng Fu-min. Surgical operation scheduling with multi-resource constrained based on the improved NSGA-II algorithm , 2012 .
[8] Teng Yan-ping,et al. Research on multi-Agent fuzzy Q-learning in intelligent office environment , 2012 .
[9] Ling Wang,et al. Teaching–learning-based optimization algorithm for multi-skill resource constrained project scheduling problem , 2017, Soft Comput..
[10] Odile Bellenguez-Morineau,et al. Methods to solve multi-skill project scheduling problem , 2008, 4OR.
[11] Karlos Artto,et al. Problems in managing internal development projects in multi-project environments , 2003 .
[12] Lu Zhi-qiang Liu Xin-yi Zhang Meng Ren Yi-fei. Project scheduling problem with hierarchical levels of skills , 2017 .
[13] Chen Jun-jie,et al. Multi-project scheduling problem with human resources based on dynamic programming and staff time coefficient , 2014, 2014 International Conference on Management Science & Engineering 21th Annual Conference Proceedings.
[14] Ling Wang,et al. A knowledge-guided multi-objective fruit fly optimization algorithm for the multi-skill resource constrained project scheduling problem , 2018, Swarm Evol. Comput..
[15] Wang Yi-fa. A Two-Stage Algorithm for Project Scheduling Problems with Multi-skilled Workforce Constraints , 2014 .
[16] David C. McClelland,et al. Identifying Competencies with Behavioral-Event Interviews , 1998 .
[17] George L. Vairaktarakis,et al. The Value of Resource Flexibility in the Resource - Constrained Job Assignment Problem , 2003, Manag. Sci..
[18] Rainer Kolisch,et al. Ablaufplanung für die Leitstrukturoptimierung in der Pharmaforschung , 2003 .
[19] Odile Bellenguez-Morineau,et al. Lower Bounds for the Multi-skill Project Scheduling Problem with Hierarchical Levels of Skills , 2004, PATAT.
[20] Y. Kadrou,et al. A new heuristic to solve RCPSP with multiple execution modes and Multi-Skilled Labor , 2006, The Proceedings of the Multiconference on "Computational Engineering in Systems Applications".
[21] Jun Zhang,et al. Ant Colony Optimization for Software Project Scheduling and Staffing with an Event-Based Scheduler , 2013, IEEE Transactions on Software Engineering.
[22] Mario Vanhoucke,et al. A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..
[23] James L. McClelland,et al. Generalization with Componential Attractors: Word and Nonword Reading in an Attractor Network , 1993 .
[24] Rainer Kolisch,et al. A Continuous-Time Model for the Resource-Constrained Project Scheduling with Flexible Profiles , 2014 .
[25] Rainer Kolisch,et al. A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles , 2017, Eur. J. Oper. Res..