Process improvement in facilities management: the SPICE approach

Considers the application of structured process improvement for construction environments (SPICE) as a process improvement technique and its extension into the context of facilities management (FM). SPICE is a research project that developed a step‐wise process improvement framework for the construction environment, utilising experience from the software industry, and in particular the capability maturity model (CMM), which has resulted in significant productivity improvements. Introduces the SPICE concept, a conceptual framework assessing the construction process capability. Commences by reviewing processes and their FM applicability and work on process improvement assessment in construction environments using the SPICE framework. Then discusses generalised principles of SPICE for process assessment. Considers its application and extension into the context of FM. Examines the specific example of FM process improvement and finally its implications. Furthermore, examines the relevance and accuracy of the framework, as well as its value to the FM organisation.

[1]  Marjan Sarshar,et al.  Spice: is a capability maturity model applicable in the construction industry? , 1999 .

[2]  Sami Zahran Software process improvement - practical guidelines for business success , 1998 .

[3]  James D. Herbsleb,et al.  Benefits of CMM-Based Software Process Improvement: Initial Results , 1994 .

[4]  M. Tinnilä Strategic perspective to business process redesign , 1995 .

[5]  Thomas H. Davenport,et al.  Process Innovation: Reengineering Work Through Information Technology , 1992 .

[6]  A. John Pendlebury,et al.  Business Process Reengineering: Breakpoint Strategies for Market Dominance , 1993 .

[7]  Winston M. Tellis,et al.  APPLICATION OF A CASE STUDY METHODOLOGY , 1997 .

[8]  Marjan Sarshar,et al.  Assessment of facilities management performance – what next? , 2000 .

[9]  H. Harrington Business process improvement , 1991 .

[10]  R. Yin Case Study Research: Design and Methods , 1984 .

[11]  R. Yin Yin, Robert K., Case Study Research: Design and Methods, 2nd ed. Newbury Park, CA: Sage, 1994. , 1994 .

[12]  Hossein Saiedian,et al.  SEI Capability Maturity Model's Impact on Contractors , 1995, Computer.

[13]  Mark C. Paulk,et al.  The Capability Maturity Model: Guidelines for Improving the Software Process , 1994 .

[14]  S. Simmons,et al.  A case for Case Study , 1992 .

[15]  Gerard O’Regan,et al.  The Capability Maturity Model , 2002 .

[16]  Bev Nutt,et al.  Linking FM practice and research , 1999 .

[17]  David Baldry,et al.  Assessment of facilities management performance in higher education properties , 2000 .

[18]  T. Jick Mixing Qualitative and Quantitative Methods: Triangulation in Action. , 1979 .

[19]  Gabriel A. Pall,et al.  Quality Process Management , 1987 .

[20]  M. Hammer,et al.  Reengineering the Corporation , 1993 .

[21]  John Hinks,et al.  A conceptual model for the interrelationship between information technology and facilities management process capability , 1998 .

[22]  Watts S. Humphrey,et al.  Managing the software process , 1989, The SEI series in software engineering.

[23]  Paul Lillrank,et al.  The Transfer of Management Innovations from Japan , 1995 .

[24]  Alan Harrison,et al.  Investigating business processes: does process simplification always work? , 1998, Bus. Process. Manag. J..

[25]  David Baldry,et al.  Building performance evaluation of higher education properties: towards a process model , 1999 .

[26]  Franklin Becker,et al.  The total workplace , 1990 .

[27]  Mark C. Paulk,et al.  Capability Maturity Model for Software , 2001 .

[28]  P. Barrett Facilities Management: Towards Best Practice , 1997 .