A Petri net based approach to modeling and scheduling for an FMS and a case study
暂无分享,去创建一个
[1] C. V. Ramamoorthy,et al. Performance Evaluation of Asynchronous Concurrent Systems Using Petri Nets , 1980, IEEE Transactions on Software Engineering.
[2] Catherine Dupont-Gatelmand. A survey of flexible manufacturing systems , 1982 .
[3] G. Rand. Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .
[4] Oded Maimon,et al. Cooperation among flexible manufacturing systems , 1985, 1985 24th IEEE Conference on Decision and Control.
[5] Jan Karel Lenstra,et al. Sequencing and scheduling : an annotated bibliography , 1997 .
[6] Clare D. McGillem,et al. Task assignment and load balancing of autonomous vehicles in a flexible manufacturing system , 1987, IEEE Journal on Robotics and Automation.
[7] Mohsen A. Jafari,et al. Performance modelling of a flexible manufacturing cell with two workstations and a single material handling device , 1987, Proceedings. 1987 IEEE International Conference on Robotics and Automation.
[8] K. Preston White,et al. A recent survey of production scheduling , 1988, IEEE Trans. Syst. Man Cybern..
[9] S. Sarin,et al. An improved branching scheme for the branch and bound procedure of scheduling n jobs on m parallel machines to minimize total weighted flowtime , 1988 .
[10] Michael Jeng-Ping Shaw. Knowledge-based scheduling in flexible manufacturing systems: an integration of pattern-directed inference and heuristic search , 1988 .
[11] Li-Chen Fu,et al. Planning and scheduling in a flexible manufacturing system using a dynamic routing method for automated guided vehicles , 1989, Proceedings, 1989 International Conference on Robotics and Automation.
[12] Tadao Murata,et al. Petri nets: Properties, analysis and applications , 1989, Proc. IEEE.
[13] Philippe Solot,et al. A concept for planning and scheduling in an FMS , 1990 .
[14] Edward Anderson,et al. Two new rules to minimize tardiness in a job shop , 1990 .
[15] Krishna R. Pattipati,et al. Schedule generation and reconfiguration for parallel machines , 1990, IEEE Trans. Robotics Autom..
[16] Alessandro Agnetis,et al. Part routing in flexible assembly systems , 1990, IEEE Trans. Robotics Autom..
[17] Krishna R. Pattipati,et al. A Lagrangian relaxation approach to job shop scheduling problems , 1990, Proceedings., IEEE International Conference on Robotics and Automation.
[18] D.J. Hoitomt,et al. Scheduling jobs with simple precedence constraints on parallel machines , 1990, IEEE Control Systems Magazine.
[19] Farzad Mahmoodi,et al. An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell , 1990 .
[20] Bruce H. Krogh,et al. Synthesis of feedback control logic for a class of controlled Petri nets , 1990 .
[21] Guochun Tang. A new branch and bound algorithm for minimizing the weighted number of tardy jobs , 1990 .
[22] T. Sawik. Modelling and scheduling of a Flexible Manufacturing System , 1990 .
[23] K. Preston White,et al. Algebraic, mathematical programming, and network models of the deterministic job-shop scheduling problem , 1991, IEEE Trans. Syst. Man Cybern..
[24] Hsu-Pin Wang,et al. Evaluation and dynamic allocation of AS/RS control rules: A simulation study , 1991 .
[25] Takashi Sekiguchi,et al. A timed Petri net and beam search based online FMS scheduling system with routing flexibility , 1991, Proceedings. 1991 IEEE International Conference on Robotics and Automation.
[26] Frank DiCesare,et al. Experimental study of a heuristic function for FMS scheduling , 1992 .
[27] MengChu Zhou,et al. A hybrid methodology for synthesis of Petri net models for manufacturing systems , 1992, IEEE Trans. Robotics Autom..
[28] Frank DiCesare,et al. FMS scheduling using Petri nets and heuristic search , 1992, Proceedings 1992 IEEE International Conference on Robotics and Automation.
[29] S. Balemi,et al. Supervisory control of a rapid thermal multiprocessor , 1993, IEEE Trans. Autom. Control..