Establishing rules to design a minicell-based manufacturing system for mass customisation
暂无分享,去创建一个
[1] Shigeji Miyazaki,et al. ANALYSIS FOR MINIMIZING WEIGHTED MEAN FLOW-TIME IN FLOW-SHOP SCHEDULING , 1980 .
[2] S. Kotha. Mass customization: Implementing the emerging paradigm for competitive advantage , 1995 .
[3] Alessandro Urbani,et al. Flexibility and Reconfigurability for Mass Customization , 2003 .
[4] William L. Berry,et al. Approaches to mass customization: configurations and empirical validation , 2000 .
[5] Jocelyn Drolet,et al. The cellular manufacturing evolution , 1996 .
[6] C. Rajendran,et al. Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop sequencing problem , 2003 .
[7] B. Joseph Pine,et al. The Experience Economy , 1999 .
[8] J. Browne,et al. The extended enterprise-a context for manufacturing , 1998 .
[9] Phanindra Kumar Chadalavada. MINIMUM FLOW TIME SCHEDULE GENETIC ALGORITHM FOR MASS CUSTOMIZATION MANUFACTURING USING MINICELLS , 2006 .
[10] Jatinder N. D. Gupta,et al. Heuristic Algorithms for Multistage Flowshop Scheduling Problem , 1972 .
[11] N. Suresh,et al. Machine-component cell formation in group technology : a neural network approach , 1992 .
[12] L. Gelders,et al. Four simple heuristics for scheduling a flow-shop , 1978 .
[13] F. Jovane,et al. Reconfigurable Manufacturing Systems , 1999 .
[14] Dale T. Masel,et al. A modular minicell configuration for mass customisation manufacturing , 2007 .
[15] C. Rajendran,et al. An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs , 1997 .
[16] David G. Dannenbring,et al. An Evaluation of Flow Shop Sequencing Heuristics , 1977 .
[17] G. Kruse,et al. Follow The Customer , 1997 .
[18] S. M. Shafer,et al. Part-Machine-Labor Grouping: The Problem and Solution Methods , 1998 .
[19] Frank T. Piller,et al. Does mass customization pay? An economic approach to evaluate customer integration , 2004 .
[20] Hamid Seifoddini,et al. Single linkage versus average linkage clustering in machine cells formation applications , 1989 .
[21] Rick Dove,et al. 21st Century Manufacturing Enterprise Strategy: An Industry-Led View , 1991 .
[22] Inyong Ham,et al. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .
[23] Yih-Long Chang,et al. A new heuristic for the n-job, M-machine flow-shop problem , 1991 .
[24] John McAuley,et al. Machine grouping for efficient production , 1972 .
[25] R. A. Dudek,et al. A Heuristic Algorithm for the n Job, m Machine Sequencing Problem , 1970 .
[26] S. Kotha. Mass Customization: The New Frontier in Business Competition , 1992 .
[27] Ali Allahverdi,et al. New heuristics to minimize total completion time in m-machine flowshops , 2002 .
[28] D. S. Palmer. Sequencing Jobs Through a Multi-Stage Process in the Minimum Total Time—A Quick Method of Obtaining a Near Optimum , 1965 .
[29] Allan S. Carrie,et al. Numerical taxonomy applied to group technology and plant layout , 1973 .
[30] Gilmore Jh,et al. The four faces of mass customization. , 1997 .
[31] J. Framiñan,et al. An efficient constructive heuristic for flowtime minimisation in permutation flow shops , 2003 .
[32] D. Chaudhuri,et al. An efficient heuristic approach to the scheduling of jobs in a flowshop , 1992 .
[33] Nancy Lea Hyer,et al. Procedures for the part family/machine group identification problem in cellular manufacturing , 1986 .
[34] Jose M. Framiñan,et al. Comparison of heuristics for flowtime minimisation in permutation flowshops Technical report IO-2003 / 01 Version 0 . 5 Last version : 26 / 07 / 2003 , 2004 .
[35] Fathima Fazleena Badurdeen. Minicell Configuration for Mass Customization Manufacturing , 2005 .
[36] Nancy Lea Hyer,et al. Reorganizing the Factory: Competing Through Cellular Manufacturing , 2001 .
[37] Carliss Y. Baldwin,et al. Managing in an age of modularity. , 1997, Harvard business review.
[38] Dale T. Masel,et al. A genetic algorithm-based approach to design minicells for mass customisation manufacturing , 2008 .
[39] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[40] Nancy Lea Hyer,et al. Work Cells with Staying Power: Lessons for Process Complete Operations , 2003 .
[41] B. J. Pine,et al. Do You Want to Keep Your Customers Forever , 2010 .