Estimating Optimum Timing for Preventive Maintenance Treatment to Mitigate Pavement Roughness

The evaluation of pavement preservation interventions is the most important component of a pavement management system. A rational methodology is needed to evaluate pavement preservation alternatives to maximize project- and network-level benefits. A lack of adequate guidance on the timing of preventive maintenance treatments was the main motivation for this study. On the basis of different evaluation criteria, several mathematical models to estimate optimum timing (OT) of various maintenance treatments were developed. On the basis of long-term benefits, the Area2T model was found to be a rational and practical tool to estimate OT for various maintenance treatments by adjusting the model's parameters. The sensitivity and practical use of the models are demonstrated in the paper. Although the modeling approach uses the existing understanding, the model can be used to estimate OT of a fix on the basis of the pretreatment pavement performance, jump in pavement condition just after treatment, and expected rate of deterioration after treatment application. The required data for the model can be obtained for various treatments from the existing historical performance data collected for pavement management purposes. The model can be calibrated to local needs by matching actual practice and calculated OT for different fix types.

[1]  Samuel Labi,et al.  An analysis of the cost-effectiveness of rigid pavement rehabilitation treatments , 2011 .

[2]  Samuel Labi,et al.  Analysis of Long-Term Effectiveness of Thin Hot-Mix Asphaltic Concrete Overlay Treatments , 2005 .

[3]  Kathleen T. Hall,et al.  Performance of Flexible Pavement Maintenance Treatments in the Long-Term Pavement Performance SPS-3 Experiment , 2003 .

[4]  Karim Chatti,et al.  Effect of Frequency of Pavement Condition Data Collection on Performance Prediction , 2010 .

[5]  Samuel Labi,et al.  Measures of Short-Term Effectiveness of Highway Pavement Maintenance , 2003 .

[6]  Samuel Labi,et al.  Comparison of Methods for Evaluating Pavement Interventions , 2009 .

[7]  Michael J Markow,et al.  OPTIMAL REHABILITATION FREQUENCIES FOR HIGHWAY PAVEMENTS , 1985 .

[8]  J Walls,et al.  Life-Cycle Cost Analysis in Pavement Design — Interim Technical Bulletin , 1998 .

[9]  Samuel Labi,et al.  Effectiveness of Highway Pavement Seal Coating Treatments , 2004 .

[10]  Todd E. Hoerner,et al.  OPTIMAL TIMING OF PAVEMENT PREVENTIVE MAINTENANCE TREATMENT APPLICATIONS , 2004 .

[11]  Olga J. Pendleton,et al.  PAVEMENT MAINTENANCE EFFECTIVENESS , 1993 .

[12]  Dar-Hao Chen,et al.  Effectiveness of Preventative Maintenance Treatments Using Fourteen SPS-3 Sites in Texas , 2003 .

[13]  Suleiman Ashur,et al.  Optimum Decision Policy for Management of Pavement Maintenance and Rehabilitation , 1999 .

[14]  Karim Chatti,et al.  Effect of Pavement Condition Data Collection Frequency on Performance Prediction , 2010 .