Tritium Purification System for TFTR

The Tritium Purification System (TPS) for the TFTR at Princeton has been designed and built by Ontario Hydro/CFFTP on a fast-track schedule of about 15 months. This paper describes the design of the system, the technical challenges, and the innovative solutions required to meet the schedule, space and inventory constraints.