A new approach for modelling variability in residential construction projects
暂无分享,去创建一个
Mehrdad Arashpour | Eric Wai Ming Lee | Ron Wakefield | Nick Blismas | E. Lee | N. Blismas | M. Arashpour | R. Wakefield | Mehrdad Arashpour
[1] Mehrdad Arashpour,et al. Improving construction productivity: implications of even flow production principles , 2013 .
[2] Derek H.T. Walker,et al. Project understanding, planning, flexibility of management action and construction time performance: two Australian case studies , 2002 .
[3] Mehrdad Arashpour,et al. Valuing the contribution of knowledge-oriented workers to projects: a merit based approach in the construction industry , 2012 .
[4] P. Moyal. The queue with impatience: construction of the stationary workload under FIFO , 2010, Journal of Applied Probability.
[5] Fah Choy Chia,et al. An analysis of construction productivity in Malaysia , 2012 .
[6] Robert W. Veryzer. The Roles of Marketing and Industrial Design in Discontinuous New Product Development , 2005 .
[7] Howard H. Bashford,et al. Impact of Inspected Buffers on Production Parameters of Construction Processes , 2009 .
[8] Makarand Hastak,et al. Internal relationship modeling and production planning optimization for the manufactured housing , 2011 .
[9] Mehrdad Arashpour,et al. A collaborative perspective in green construction risk management , 2012 .
[10] Lauri Koskela,et al. Is production outside management? , 2012 .
[11] Luis F. Alarcón,et al. Site Management of Work-in-Process Buffers to Enhance Project Performance Using the Reliable Commitment Model: Case Study , 2011 .
[12] Anil Sawhney,et al. Implications of Even Flow Production Methodology for U.S. Housing Industry , 2003 .
[13] Feniosky Peña-Mora,et al. MULTIPLE DEVICE COLLABORATIVE AND REAL TIME ANALYSIS SYSTEM FOR PROJECT MANAGEMENT IN CIVIL ENGINEERING , 2002 .
[14] Uskali Mäki. The Methodology of Positive Economics , 2009 .
[15] M. Friedman,et al. The Methodology of Positive Economics , 2010 .
[16] Howard H. Bashford,et al. Production Equations for Unsteady-State Construction Processes , 2007 .
[17] Mohan M. Kumaraswamy,et al. Improved subcontractor selection employing partnering principles , 2000 .
[18] James A. Powell,et al. AN EXPLORATORY STUDY ON THE APPLICABILITY OF PROCESS TRANSPARENCY IN CONSTRUCTION SITES , 2002 .
[19] David Simchi-Levi,et al. Introduction to "Little's Law as Viewed on Its 50th Anniversary" , 2011, Oper. Res..
[20] Ehsan Eshtehardian,et al. Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm , 2013 .
[21] Daniel W. Halpin,et al. Design of construction and process operations , 1976 .
[22] D. Greenwood. Subcontract procurement: are relationships changing? , 2001 .
[23] Weisheng Lu,et al. Optimizing construction planning schedules by virtual prototyping enabled resource analysis , 2009 .
[24] Julio C. Martinez. Methodology for Conducting Discrete-Event Simulation Studies in Construction Engineering and Management , 2010 .
[25] Dino Bouchlaghem,et al. Visualisation in architecture, engineering and construction (AEC) , 2005 .
[26] Wallace J. Hopp,et al. To Pull or Not to Pull: What Is the Question? , 2004, Manuf. Serv. Oper. Manag..
[27] Wallace J. Hopp,et al. Mitigating the Impact of Disruptions in Supply Chains , 2011 .
[28] Tony Dalton. Australian suburban house building: industry organisation, practices and constraints - final report , 2011 .
[29] Mehrdad Arashpour,et al. Role of simulation in construction processes - Harmony in capturing resources , 2012 .
[30] Lars Stehn,et al. Applicability of lean principles and practices in industrialized housing production , 2008 .
[31] Eric Henry. Quality management standardization in the French construction industry: singularities and internationalization prospects , 2000 .
[32] Mehrdad Arashpour,et al. Gaining the best value from HR in construction companies , 2010 .
[33] Anil Sawhney,et al. Cost of Risk Transfer: Pricing Agreements in Residential Supply Chains , 2004 .
[34] Anil Sawhney,et al. Production System Loading-Cycle Time Relationship in Residential Construction , 2005 .
[35] Vineet R. Kamat,et al. Software mechanisms for extensible and scalable 3D visualization of construction operations , 2008, Adv. Eng. Softw..
[36] Ron Wakefield,et al. Concrete prefabricated housing via advances in systems technologies: development of a technology roadmap , 2010 .