Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization
暂无分享,去创建一个
[1] Ling Wang,et al. Effective heuristics for the blocking flowshop scheduling problem with makespan minimization , 2012 .
[2] Quan-Ke Pan,et al. Discrete harmony search algorithm for the no-wait flow shop scheduling problem with total flow time criterion , 2011 .
[3] Xiaoping Li,et al. Accelerated tabu search for no-wait flowshop scheduling problem with maximum lateness criterion , 2010, Eur. J. Oper. Res..
[4] L. Wang,et al. A DE-based approach to no-wait flow-shop scheduling , 2009, Comput. Ind. Eng..
[5] Quan-Ke Pan,et al. A novel differential evolution algorithm for bi-criteria no-wait flow shop scheduling problems , 2009, Comput. Oper. Res..
[6] A. Allahverdi,et al. New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness , 2009 .
[7] Subhash C. Sarin,et al. A heuristic to minimize total flow time in permutation flow shop , 2009 .
[8] Uday K. Chakraborty,et al. A constructive heuristic for minimizing makespan in no-wait flow shop scheduling , 2009 .
[9] Q. Wang,et al. Efficient composite heuristics for total flowtime minimization in permutation flow shops , 2009 .
[10] Quan-Ke Pan,et al. An improved iterated greedy algorithm for the no-wait flow shop scheduling problem with makespan criterion , 2008 .
[11] M. F. Tasgetiren,et al. A hybrid discrete particle swarm optimization algorithm for the no-wait flow shop scheduling problem with makespan criterion , 2008 .
[12] R. Tavakkoli-Moghaddam,et al. Solving a multi-objective no-wait flow shop scheduling problem with an immune algorithm , 2008 .
[13] J. Kamburowski,et al. On the NEH heuristic for minimizing the makespan in permutation flow shops , 2007 .
[14] Tariq A. Aldowaisan,et al. NEW HEURISTICS FOR M-MACHINE NO-WAIT FLOWSHOP TO MINIMIZE TOTAL COMPLETION TIME , 2004 .
[15] Stefan Voß,et al. Solving the continuous flow-shop scheduling problem by metaheuristics , 2003, Eur. J. Oper. Res..
[16] J. Framiñan,et al. An efficient constructive heuristic for flowtime minimisation in permutation flow shops , 2003 .
[17] Ling Wang,et al. An Effective Hybrid Heuristic for Flow Shop Scheduling , 2003 .
[18] Tariq A. Aldowaisan. A new heuristic and dominance relations for no-wait flowshops with setups , 2001, Comput. Oper. Res..
[19] Ali Allahverdi,et al. Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times , 2001, J. Oper. Res. Soc..
[20] Edy Bertolissi,et al. Heuristic algorithm for scheduling in the no-wait flow-shop , 2000 .
[21] Han Hoogeveen,et al. Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing , 2000, Eur. J. Oper. Res..
[22] Józef Grabowski,et al. Sequencing of jobs in some production system , 2000, Eur. J. Oper. Res..
[23] Tariq A. Aldowaisan,et al. No-wait and separate setup three-machine flowshop with total completion time criterion , 2000 .
[24] Chelliah Sriskandarajah,et al. A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..
[25] Chandrasekharan Rajendran,et al. A No-Wait Flowshop Scheduling Heuristic to Minimize Makespan , 1994 .
[26] Éric D. Taillard,et al. Benchmarks for basic scheduling problems , 1993 .
[27] G. Rand. Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .
[28] Inyong Ham,et al. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .