MRP systems under supply and process uncertainty in an integrated shop floor control

Abstract We investigated the effect of supplier and process uncertainty in a real time MRP environment. The environment modelled is supported by an ‘on line’ data monitoring and data collection system such that the activities of the shop floor and the receiving area are incorporated within the MRP database as they occur. The purpose of the model is to evaluate the operation of an integrated shop floor control/M R P system in a multi-level product structure environment which operates on a rolling horizon basis. The interaction of supply/process uncertainty with product structure and choice of lot sizing rule is examined for various cost factors. The presence of uncertainty is found to greatly complicate the operation of the MRP system. In addition, supply/process uncertainty combines with product structure and the choice of lot sizing rule, to impact the cost performance of the system. The significance of these interactions was confirmed by the formulation and testing of several hypotheses. Based on these ...

[1]  Joseph R. Biggs HEURISTIC LOT-SIZING AND SEQUENCING RULES IN A MULTISTAGE PRODUCTION-INVENTORY SYSTEM , 1979 .

[2]  Jatinder N. D. Gupta,et al.  Determining lot sizes and resource requirements: A review , 1987 .

[3]  Carolina Chang,et al.  The interchangeability of safety stocks and safety lead time , 1985 .

[4]  Larry R. Dolinsky,et al.  Adjusting replenishment orders to reflect learning in a material requirements planning environment , 1990 .

[5]  D. Clay Whybark,et al.  MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY , 1976 .

[6]  Lee J. Krajewski,et al.  Kanban, MRP, and Shaping the Manufacturing Environment , 1987 .

[7]  Steven A. Melnyk,et al.  Leadtime errors in MRP: the lot-sizing effect , 1985 .

[8]  Surendra M. Gupta,et al.  Heuristic and optimal approaches to lot-sizing incorporating backorders: an empirical evaluation , 1992 .

[9]  B. W. Taylor,et al.  A simulation-based experimental investigation of supply/timing uncertainty in MRP systems , 1984 .

[10]  Everett E. Adam,et al.  Forecasting error evaluation in material requirements planning (MRP) production-inventory systems , 1986 .

[11]  Joseph D. Blackburn,et al.  Improved heuristics for multistage requirements planning systems , 1982 .

[12]  Emre A. Veral,et al.  THE PERFORMANCE OF A SIMPLE INCREMENTAL LOT‐SIZING RULE IN A MULTILEVEL INVENTORY ENVIRONMENT , 1985 .

[13]  D. N. P. Murthy,et al.  MRP with uncertainty: a review and some extensions , 1991 .

[14]  L. V. Wassenhove,et al.  COST INCREASES DUE TO DEMAND UNCERTAINTY IN MRP LOT SIZING , 1983 .

[15]  V. Sridharan,et al.  Freezing the Master Production Schedule Under Demand Uncertainty , 1990 .

[16]  W. C. Benton,et al.  PRODUCT STRUCTURE COMPLEXITY AND MULTILEVEL LOT SIZING USING ALTERNATIVE COSTING POLICIES , 1985 .

[17]  Dean H. Kropp,et al.  A comparison of strategies to dampen nervousness in MRP systems , 1986 .

[18]  Joseph D. Blackburn,et al.  The impact of a rolling schedule in a multi-level MRP system , 1982 .

[19]  Luk N. Van Wassenhove,et al.  The effect of engineering changes and demand uncertainty on MRP lot sizing: a case study , 1985 .

[20]  Eisenhower C. Etienne Choosing optimal buffering strategies for dealing with uncertainty in MRP , 1987 .

[21]  Sidney Addelman,et al.  trans-Dimethanolbis(1,1,1-trifluoro-5,5-dimethylhexane-2,4-dionato)zinc(II) , 2008, Acta crystallographica. Section E, Structure reports online.

[22]  Jatinder N. D. Gupta,et al.  OR Practice - Determining Lot Sizes and Resource Requirements: A Review , 1987, Oper. Res..

[23]  Randall P. Sadowski,et al.  Introduction to Simulation Using Siman , 1990 .

[24]  G. D. Eppen,et al.  Determining Safety Stock in the Presence of Stochastic Lead Time and Demand , 1988 .

[25]  Eric M. Malstrom,et al.  Computer simulation of lot-sizing algorithms in three-stage multi-echelon inventory systems , 1984 .